Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 917.04 199.71 21.78  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Itinda Panitor to accommodate FHTC , SM/11626 Augmentation Material Requisition To Resource Division RTOR000197/2022-2023 857/BD 20/03/2023 Resource Division 190.23 0.00 0 0
2 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Itinda Panitor to accommodate FHTC , SM/11626 Augmentation Supply, delivery & installation of Submersible Pumping Machinery alongwith allied electro- mechanical works and chlorinator(in connection with Aug. work related to FHTC) at Pump House No.II under Itindapanitor W/S Scheme District of 24 Pgs. (N) ORD/001894/2022-2023 6387 / EMD 14/08/2022 30 RAJLAXMI ELECTRICAL WORKS 13.04 9.48 72.7 1
3 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Itinda Panitor to accommodate FHTC , SM/11626 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I (Replacement) under Itinda-Panitor W/S Scheme District of 24 Pgs. (N). (SM/11626) NIET No.- 19 of EE/EMD of 2022-23 (Sl. No.- 11) ORD/002035/2022-2023 6386/ EMD 14/08/2022 30 GLACIER ENGINEERING CO. 13.04 8.22 63.04 1
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Itinda Panitor to accommodate FHTC , SM/11626 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Itinda Panitor water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/001119/2022-2023 429/BD 13/02/2023 90 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 662.31 182.01 27.48 24
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Itinda Panitor to accommodate FHTC , SM/11626 Augmentation Material Requisition To Resource Division RTOR000153/2023-2024 4414/BD 10/11/2023 Resource Division 18.48 0.00 0 0
6 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Itinda Panitor to accommodate FHTC , SM/11626 Augmentation Providing drilling crew and other allied works for construction of Tube Well ( 300mm X200mm X 270 Mtrs. Depth) by utilising Departmental Machineries for Itinda Panitar W/S Scheme (T/W-I) , Basirhat-I Block under North 24 Pgs. District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000168/2023-2024 117/CDD 17/04/2023 30 SUNRISE ENGINEERING CORPORATION 19.94 0.00 0 0
Total 917.05 199.72 21.78