Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 555.01 258.69 46.61  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Route Survey, Design Drawing & Preparation of DPR for Chowberia Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002788/2021-2022 127/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.45 3.43 99.42 1
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Material Requisition To Resource Division RTOR000094/2022-2023 3662/BD 13/12/2022 Resource Division 14.00 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Material Requisition To Resource Division RTOR000111/2022-2023 3689/BD 14/12/2022 Resource Division 124.58 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Repairing & Renovation 2(Two) nos of Pump House and allied works of Chowberia water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/003000/2021-2022 532/Bon 03/11/2021 21 A.D.ENTERPRISE. 2.52 2.51 99.6 1
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chowberia Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000788/2022-2023 3546/BD 06/12/2022 90 M/S B.K.ENTERPRISE. 279.32 227.89 81.59 1
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Acceptance cum work order for Improvement of Iron Elimination Plant and other related allied works and Repairing & renovation of Compressor Room for Iron Elimination Plant under Augmentation of Chauberia Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte Assistant Engineer ORD/001564/2023-2024 53/BD 05/01/2024 30 TAPAN GHOSH. 6.03 0.00 0 0
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chauberia water supply scheme at 2nd T/W Site under Bongaon Sub-Division P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000795/2023-2024 2695/BD 04/09/2023 30 DHELA BABA ENTERPRISE 16.17 5.87 36.3 100
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chauberia Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte Assistant Engineer Junior Engineer ORD/001110/2023-2024 2923/BD 26/09/2023 30 SAHA CONSTRUCTION & CO 16.14 6.86 42.5 100
9 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Acceptance cum work order for Construction of Boundary wall aand Construction of Approach Road at 1st T/W site under Augmentation of Chauberia water Supply scheme, Bongaon Block within jurisdiction of Bongaon Sub-Division, under Barasat Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001499/2023-2024 4485/BD 23/11/2023 23 TAPAN GHOSH. 5.58 0.00 0 0
10 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Chowberia Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000352/2024-2025 2418/BD 23/08/2024 60 M/S B.K.ENTERPRISE. 35.07 0.00 0 0
11 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC , SM/11592 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Rep) under Krishnachandrapur W/S Scheme and Chowberia W/S Scheme District of 24 Pgs. (N) Assistant Engineer Junior Engineer ORD/001173/2023-2024 4801/EMD 09/08/2023 30 A.G ENTERPRISE. 52.15 12.13 23.26 50
Total 555.02 258.70 46.61