Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 543.99 364.96 67.09  
1 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Repairing of Pump House No 1 at Rajandrapur Water Supply Scheme under Basirhat Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/002987/2021-2022 1237/BHT 16/09/2021 20 PROBAHA ENGINEER'S CO-OP-SOCIETY LTD. 0.66 0.45 68.18 1
2 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Repairing of Pump House No 1 at Rajandrapur Water Supply Scheme under Basirhat Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000369/2021-2022 1236 /BHTSD 16/09/2021 20 MD AMIRUL MOLLA. 0.64 0.45 70.31 1
3 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Route Survey, Design Drawing & DPR Preparation for RAJENDRAPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002965/2021-2022 311/BHT 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.19 3.85 91.89 1
4 NORTH 24 PARGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I (Replacement) under Rajendrapur W/S Scheme District of 24 Pgs. (N). (SM/11526) NIET No. 19 of EE/EMD of 2022-23 (Sl. No. - 22) ORD/000598/2022-2023 6441/EMD 25/11/2022 30 MAA TARA ENTERPRISE 13.04 11.81 90.57 0
5 NORTH 24 PARGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Providing drilling crew and other allied works for construction of Tube Well ( 300mm X200mm X 300 Mtrs. Depth) by utilising Departmental Machineries for Rajendrapur W/S Scheme (TW-II) , Barasat-II Block under North 24 Pgs. District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000084/2023-2024 1648/CDD 17/10/2023 30 DIPALI CONSTUCTION 21.78 0.00 0 0
6 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Material Requisition To Resource Division RTOR000199/2022-2023 855/BD 20/03/2023 0 Resource Division 71.29 0.00 0 0
7 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Material Requisition To Resource Division RTOR000155/2023-2024 4416/BD 10/11/2023 0 Resource Division 12.32 0.00 0 0
8 NORTH 24 PARGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.II (Replacement) under Rajendrapur W/S Scheme District of 24 Pgs. (N). (SM/11526) NIET No. 19 of EE/EMD of 2022-23 (Sl. No. - 23) Assistant Engineer Junior Engineer ORD/000597/2022-2023 6440/EMD 25/11/2022 70 M.D. ENTERPRISE 13.02 7.39 56.76 40
9 NORTH 24 PARGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Providing drilling crew and other allied works for construction of Tube Well ( 300mm X200mm X 300 Mtrs. Depth) by utilising Departmental Machineries for Rajendrapur W/S Scheme (T/W-I) , Basirhat-II Block under North 24 Pgs. District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000063/2023-2024 546/CDD 02/06/2023 300 UNIVERSAL ENTERPRISES 21.54 14.50 67.32 100
10 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Acceptance cum work order for Restoration of roads and emergency protection work under different places of Rajendrapur Water Supply Scheme within Basirhat Sub-Division under Barasat Division P.H.E.Dte. Assistant Engineer ORD/000294/2025-2026 2452/BD 16/07/2025 30 ABDUL CHHAMAD MANDAL 9.09 0.00 0 0
11 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajendrapur to accommodate FHTC , SM/11526 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Rajendrapur water supply scheme in Basirhat-II Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/001012/2022-2023 174/BD 19/01/2023 799 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 376.42 326.51 86.74 70
Total 543.99 364.97 67.09