Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 171.55 64.11 37.37  
1 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gabberia to accommodate FHTC. , SM/10781 Augmentation Material Requisition To Resource Division RTOR000247/2022-2023 938/BD 22/03/2023 0 Resource Division 19.76 0.00 0 0
2 NORTH 24 PARGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Gabberia to accommodate FHTC. , SM/10781 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I & II (Replacement) under Puturia W/S Scheme, Bahira W/S Scheme, Gabberia W/S Scheme and Gobindapur (Block-Bagdah) W/S Scheme, District of 24 Pgs. (N). Assistant Engineer Junior Engineer ORD/001174/2023-2024 4802/EMD 09/08/2023 30 M/S. SAJAHAN CHOWDHURY 88.56 20.53 23.18 50
3 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gabberia to accommodate FHTC. , SM/10781 Augmentation Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Gabberia w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer ORD/000723/2023-2024 2475/BD 18/08/2023 30 M/S RAJPATH CONSTRUCTION. 63.23 43.58 68.92 92
Total 171.55 64.11 37.37