Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 684.09 539.88 78.92  
1 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Repairing & renovation of Pump House No. - 1, 2 & 3 of Maslandapur W/S scheme (Zone - I) within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/002976/2021-2022 489/HAB 30/11/2021 30 ANJALI CONSTRUCTION. 2.77 2.71 97.83 1
2 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Material Requisition To Resource Division RTOR000134/2022-2023 3794/BD 22/12/2022 0 Resource Division 21.91 0.00 0 0
3 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Acceptance cum work order for Sinking of 2 nos. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 2 & 3 for Augmentation of Maslandapur (Zone - I) water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000954/2023-2024 2773/BD 11/09/2023 60 NADIA TUBEWELLS 28.96 0.00 0 0
4 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Continuation order for one motor launch (M.V. JOYMAKALI) on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.03.23 to 31.08.23 = 184 days. Assistant Engineer ORD/001146/2022-2023 0255/HSD 28/02/2023 184 SUSMITA MANDAL. 2.74 8.46 308.76 100
5 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Acceptance cum work order for Hiring of one no. DIESEL MOTOR CAB (BS-VI) on daily basis for smooth implementation of JJM work under office of the Assistant Engineer, HASNABAD SUB-DIVISION, PHE DTE. Period from 01.02.23 to 31.07.23. Assistant Engineer Junior Engineer ORD/001349/2022-2023 137/HSD 31/01/2023 181 SARKAR ENTERPRISE 0.86 1.85 215.12 100
6 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Continuation order for Hiring of one no. Disel Motor Cab (BS-IV) on daily hire basis for use of the Assistant Engineer, Hasnabad Sub-Division, PHE Dte. Period from 01.10.2022 to 30.09.2023. Assistant Engineer ORD/001479/2022-2023 1656/HSD 28/09/2022 365 SUSMITA MANDAL. 1.72 3.72 216.28 50
7 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Maslandapur Water Supply Scheme (Zone - I) within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000618/2022-2023 2720/BD 14/09/2022 90 UMWELT ENGINEER PVT.LTD. 512.52 480.61 93.77 1
8 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Material Requisition To Resource Division RTOR000056/2023-2024 1557/BD 23/05/2023 0 Resource Division 3.08 0.00 0 0
9 NORTH 24 PARGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II & III (Zone-I) under Maslandapur W/S Scheme and Pump House No-I an II uuder Kamarpur-Tazpur W/S Scheme (Rep.) District of 24 Pgs. (N) NIET No.- 29 of EE/EMD of 2022-23 (Sl. No.- 26) Assistant Engineer Junior Engineer ORD/001976/2022-2023 1320/EMD 29/03/2023 30 M/S DILIP MITRA 53.00 25.78 48.64 80
10 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Acceptance cum work order for construction of the Boundary wall in Pump House No 2 & Pump House No. 3 of Maslandapur- I Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. Assistant Engineer ORD/000166/2024-2025 1801/BD 01/07/2024 45 ANJALI CONSTRUCTION. 6.11 0.00 0 0
11 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Acceptance cum work order for construction of the Service Road (88.00 Mtr. Length & 3.00 Mtr. Wide while 1.00 Mtr. wide road already existing) in Head Work Site of Maslandapur- I Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. Assistant Engineer ORD/000167/2024-2025 2209/BD 06/08/2024 15 PUSPA CONSTRUCTION. 5.60 0.00 0 0
12 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Acceptance cum work order for Sinking of 1 no. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Head Work Site of Maslandapur water supply scheme (Zone - I) within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000046/2023-2024 1409/BD 08/05/2023 30 NADIA TUBEWELLS 14.49 12.00 82.82 100
13 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Improvement of Iron Elimination Plant at Maslandapur W/S Scheme (Zone - I) within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001430/2023-2024 693/HAB 02/11/2023 30 ANJALI CONSTRUCTION. 4.78 4.75 99.37 100
14 NORTH 24 PARGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-I to accommodate , SM/10531 Augmentation Enhancement of GST for the work providing FHTC for Augmentation of Maslandapur (Zone-I) W/S Scheme BILL/00274/2024-2025 BP-2024-25-778 10/07/2024 0 UMWELT ENGINEER PVT.LTD. 25.55 0.00 0 0
Total 684.10 539.87 78.92