Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 610.67 469.83 76.94  
1 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC , SM/10371 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I (replacement) under Boyermari Abad W/S Scheme in Sandeshkhali-I Block District of North 24 Pgs. Tender No.- 08(Sl. No.-04) of EE/EMD of 2022-23 ORD/001668/2022-2023 3385 /EMD 14/08/2022 30 PERFECT AIR CONDITIONER 10.82 9.96 92.05 1
2 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC , SM/10371 Augmentation Supply, delivery & installation of Submersible Pumping Machinery alongwith allied electro- mechanical works and chlorinator(in connection with Aug. work related to FHTC) at Pump House No.I under Boyermari W/S Scheme District of 24 Pgs. (N) ORD/001901/2022-2023 3385 / EMD 14/08/2022 30 PERFECT AIR CONDITIONER 10.82 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC , SM/10371 Augmentation Material Requisition To Resource Division RTOR000246/2022-2023 931/BD 22/03/2023 Resource Division 9.92 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC , SM/10371 Augmentation Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Boyermari Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000359/2022-2023 2237/BD 28/07/2022 30 M/S K.P.PAL. 44.40 28.38 63.92 1
5 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC , SM/10371 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.II (replacement) under Boyermari Abad W/S Scheme in Sandeshkhali-I Block District of North 24 Pgs. Tender No.- 1452(Sl. No.-04) of EE/EMD of 2022-23, (1) Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC ORD/001975/2022-2023 3386/ EMD 14/08/2022 365 M.S.C. ENTERPRISE 10.81 9.96 92.14 1
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC , SM/10371 Augmentation Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Boyermari Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte Assistant Engineer ORD/000259/2023-2024 785/HSD 13/07/2023 10 MD.SALIM GAZI. 0.87 0.87 100 100
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC , SM/10371 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Boyermari Abad water supply scheme, Sandeshkhali-I Block within Hasnabad Sub-Division, under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000669/2022-2023 2928/BD 26/09/2022 90 S.S.ENTERPRISE. (BAMANGACHI) 370.05 365.77 98.84 1
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Boyermari Abad to accommodate FHTC , SM/10371 Augmentation Formal work order for Construction of 350 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Boyermari Abad water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000217/2023-2024 1732/BD 08/06/2023 365 M/S DATTA ENTERPRISE. 152.98 54.89 35.88 72
Total 610.67 469.83 76.94