Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 522.18 461.9 88.46  
1 NADIA Nadia Arsenic Division I Providing FHTC (Functional Household Tap Connection) by Augmentation under JJM for Matikumra Ground Water Based Piped Water Supply Scheme (Phase-II) , Block-Ranaghat-II, District-Nadia. , SM/10653 Augmentation Providing FHTC under Jaldhara/ Jal Swapna for matikumra Phase -II at Ranaghat -II Block by augmentation of Ground Water bassed PWSS for Matikumra Water Supply Sch. under Nadia Arsenic Division -I , P.H.E.Dte. (Sl.no.04) Assistant Engineer-I ,Assistant Engineer-II Junior Engineer-III ORD/000082/2022-2023 1769 / NAD-I 20/09/2022 90 KINGS AND CO 436.53 425.81 97.54 65
2 NADIA Nadia Arsenic Division I Providing FHTC (Functional Household Tap Connection) by Augmentation under JJM for Matikumra Ground Water Based Piped Water Supply Scheme (Phase-II) , Block-Ranaghat-II, District-Nadia. , SM/10653 Augmentation Dedicated pipeline from Manifold to distribution system including allied works under MatikumraW/S Scheme under Nadia Arsenic Division-I, PHE Dte. (Sl. No. 07) Assistant Engineer-I Junior Engineer-I ORD/000050/2024-2025 1500/NAD-I 18/09/2024 45 M/S DIPAK ENTERPRISE 39.18 36.09 92.11 90
3 NADIA Nadia Arsenic Division I Providing FHTC (Functional Household Tap Connection) by Augmentation under JJM for Matikumra Ground Water Based Piped Water Supply Scheme (Phase-II) , Block-Ranaghat-II, District-Nadia. , SM/10653 Augmentation Augmentation & Retrofitting work under Jal Jeevan Mission (JJM) for MATIKUMRA including crossing of SH-11 by jackpushing and interconnection pipeline at Birnagar village under Ground Water based PWSS for MATIKUMRA Water Supply Scheme under Nadia Arsenic Division-I, PHE Dte. (Sl. No. 01) Assistant Engineer-I Junior Engineer-I ORD/000035/2025-2026 169/NAD-I 29/04/2025 60 M/S DIPAK ENTERPRISE 46.47 0.00 0 100
Total 522.19 461.90 88.46