Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 1,527.3 198.66 13.01  
1 PURBA BARDHAMAN Memari-I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at CHANCHAL Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000788/2023-2024 4078/CMD 29/08/2023 30 UNIVERSAL ENTERPRISES 44.10 0.00 0 0
2 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000291/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.41 0.00 0 0
3 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000532/2023-2024 4294/BWD 29/09/2023 0 Resource Division 1.69 0.00 0 0
4 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000572/2023-2024 4922/BWD 10/11/2023 0 Resource Division 41.11 0.00 0 0
5 PURBA BARDHAMAN Memari-I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
6 PURBA BARDHAMAN Memari-I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New New Service connection for Chanchal PWSS TW-1. BILL/02335/2023-2024 BP-2023-24-476 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.26 0.00 0 0
7 PURBA BARDHAMAN Memari-I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New New Service connection for Chanchal PWSS TW-2. BILL/02334/2023-2024 BP-2023-24-477 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 14.29 0.00 0 0
8 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Shifting of 11KV HTOH Line for construction of new OHR of Chanchal pwss under Burdwan Division, PHE Dte. [Ref ID-860319929, App ID-100000124989, dt.-10/12/2024] BILL/01092/2024-2025 1172/JJM 17/12/2024 0 WBSEDCL 7.00 0.00 0 0
9 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHANCHAL & NUDIPUR Piped Water Supply Scheme under Memari I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000692/2023-2024 4389/BWD 05/10/2023 730 MANASH GHOSH 1,343.97 198.66 14.78 45
10 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related (schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-05-2025 to 31-07-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000181/2025-2026 960/BSD 30/04/2025 66 PARVIN BEGAM 0.85 0.00 0 100
Total 1,527.31 198.66 13.01