Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 1,951.09 287.9 14.76  
1 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Berugram Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] ASSISTANT ENGINEER Junior Engineer ORD/000932/2023-2024 4195/CMD 29/08/2023 30 M/S, S.DAS AND ENTERPRISE. 29.71 0.00 0 0
2 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000249/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.09 0.00 0 0
3 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000523/2023-2024 4289/BWD 29/09/2023 0 Resource Division 16.32 0.00 0 0
4 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000655/2023-2024 5114/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
5 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
6 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New New Service connection for Berugram PWSS TW-2. BILL/02333/2023-2024 BP-2023-24-475 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.69 0.00 0 0
7 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Quotation for new service connection at Berugram W/S Scheme PH-I. BILL/01804/2023-2024 BP-2023-24-323 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.94 0.00 0 0
8 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BERUGRAM & SULTANPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000979/2023-2024 092/BWD 05/01/2024 604 SK ALIM 1,368.51 287.39 21 55
9 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day. [PeriodFebruary.'2025 to April'2025] ORD/001180/2024-2025 129/DSD 29/01/2025 78 MD HASIN 1.00 0.00 0 0
10 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period NOV.'2024 to JAN.'2025] ORD/000847/2024-2025 886/DSD 21/10/2024 78 MD HASIN 1.00 0.33 33 0
11 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period AUG.'2024 to OCT.'2024] ORD/000845/2024-2025 575/DSD 19/07/2024 78 MD HASIN 1.00 0.18 18 0
12 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
13 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Balance work of BERUGRAM & SULTANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001214/2024-2025 723/BWD 24/02/2025 180 MD HASIN 438.83 0.00 0 0
14 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day for the month of May'2025 ORD/000142/2025-2026 660/DSD 30/04/2025 31 MD HASIN 0.40 0.00 0 0
Total 1,951.07 287.90 14.76