Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 1,632.38 84.09 5.15  
1 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Material Requisition To Resource Division RTOR000056/2023-2024 1962/BWD 25/04/2023 0 Resource Division 45.18 0.00 0 0
2 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Material Requisition To Resource Division RTOR000204/2023-2024 2155/BWD 10/05/2023 0 Resource Division 11.21 0.00 0 0
3 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Work order for "Restoration of pipeline with other allied works at different places of Bharkunda,potna,Bara dhamash,Balindar,Tola mouja under Balindar Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-II panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000858/2024-2025 1844/KSD 27/11/2024 15 SUPRITI ENTERPRISE 2.86 0.00 0 0
4 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR BALINDAR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001150/2023-2024 2106/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.66 100 2
5 PURBA BARDHAMAN Kalna-II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New New service connection for BALINDAR PWSS TW-2. BILL/02401/2023-2024 BP-2023-24-503 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.97 0.00 0 0
6 PURBA BARDHAMAN Kalna-II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New New service connection charges for Balindar PWSS TW-1 BILL/01867/2023-2024 BP-2023-24-357 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.20 0.00 0 0
7 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALINDAR, CHAK SHIMLA & DWARIATAN Piped Water Supply Scheme under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000539/2023-2024 3700/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,424.22 83.43 5.86 30
8 PURBA BARDHAMAN Kalna-II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BALINDAR Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000858/2023-2024 4126/CMD 29/08/2023 756 ASIA CONSTRUCTION. 28.98 0.00 0 90
9 PURBA BARDHAMAN Kalna-II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
10 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Construction of Pipe carrying Truss Bridge for carrying 200 mm dia MS Pipe at PWD Bridge under Hatgachha Mouza under the command area of Balindar PWSS (SM/16478) within Kalna -II block of Kalna Sub-Division, PHE Dte under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000017/2025-2026 1244/BWD 23/04/2025 60 M/S DATTA ENTERPRISE 29.30 0.00 0 1
Total 1,632.37 84.08 5.15