Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 1,646.36 5.71 0.35  
1 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000039/2023-2024 1962/BWD 25/04/2023 Resource Division 1.93 0.00 0 0
2 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000266/2023-2024 2197/BWD 12/05/2023 Resource Division 15.26 0.00 0 0
3 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000730/2023-2024 5231/BWD 30/11/2023 Resource Division 20.37 0.00 0 0
4 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PALISGRAM, PURBA NAYAPARA & SITAHATI Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000695/2023-2024 4364/BWD 04/10/2023 365 M/S S. CHOUDHURY 1,505.07 0.00 0 9
5 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New New service connection for Purba Nayapara PWSS TW 2. BILL/02912/2023-2024 BP-2023-24-622 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.56 0.00 0 0
6 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New New service connection for Purba Nayapara PWSS TW 1. BILL/02911/2023-2024 BP-2023-24-621 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.46 0.00 0 0
7 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New New service connection for Purba Nayapara PWSS TW 1. BILL/02911/2023-2024 BP-2023-24-621 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.46 0.00 0 0
8 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PURBA NAYAPARA Water Supply Scheme [ Block- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000874/2023-2024 4137/CMD 29/08/2023 30 P.K. ENGINEERING 29.60 5.71 19.29 88
9 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 90 CHOUDHURY ENTERPRISE 57.65 0.00 0 0
Total 1,646.36 5.71 0.35