Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 81.7 1.32 1.62  
1 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Preparation and Submission of DPR for Augmentation of Nandra PWSS under Burdwan-II Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000349/2023-2024 1476/BSD 12/07/2023 15 CARTO 0.78 0.77 98.72 100
2 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Augmentation of NADRA Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & Rising Main under BARDHAMAN-II Block, District:- Purba-Bardhaman. _2ND CALL ORD/000965/2023-2024 002/BWD 02/01/2024 180 R.G. INFRASTRUCTURE 72.79 0.00 0 0
3 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Continuation Work for the supply of one no. Diesel driven Motor Cab/Maxi Cab (Air Conditioner) on hire basis for the office of the Assistant Engineer, to be used by the Assistant Engineer, RWS Burdwan Sub-Divn., PHE. Dte. (Period from 01/03/2024 to 30/04/2024) Contractual Junior Engineer,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001222/2023-2024 62/RWS 27/02/2024 60 MD HASIN 0.80 0.55 68.75 0
4 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Nandra village of Burdwan-II Block under Nandra Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000484/2025-2026 2346/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
5 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Different type of works related internal pathways and approach road, land development, repair of boundary wall & pump houses and road restoration under NANDRA PWSS under Burdwan II Block under Burdwan Divn., PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000721/2025-2026 1404/BWD 16/05/2025 45 POMPA CONSTRUCTION CO. 5.89 0.00 0 0
6 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Naopara village of Burdwan-II Block under Nandra Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000487/2025-2026 2359/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
Total 81.70 1.32 1.62