Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 730.51 149.45 20.46  
1 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
2 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000352/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.94 0.00 0 0
3 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000681/2023-2024 5081/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000425/2023-2024 3837/BWD 01/09/2023 0 Resource Division 6.91 0.00 0 0
5 PURBA BARDHAMAN Raina-II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
6 PURBA BARDHAMAN Raina-II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New New service connection for Narottambati PWSS. BILL/02404/2023-2024 BP-2023-24-496 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.09 0.00 0 0
7 PURBA BARDHAMAN Raina-II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New NEW SERVICE CONNECTION FOR NAROTTAMBATI PWSS TW 2. BILL/03180/2023-2024 BP-2023-24-664 22/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.31 0.00 0 0
8 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New NAROTTAMBATI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000488/2023-2024 3501/BWD 10/08/2023 875 S.S.S. ENTERPRISES 585.33 149.09 25.47 75
9 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-12-2024 to 28-02-2025 JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001043/2024-2025 2636/BSD 29/11/2024 90 SK. ASFIA 1.20 0.36 30 60
Total 730.49 149.46 20.46