Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 1,845.3 0 0  
1 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000171/2023-2024 2155/BWD 10/05/2023 0 Resource Division 8.61 0.00 0 0
2 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000586/2023-2024 4930/BWD 10/11/2023 0 Resource Division 34.57 0.00 0 0
3 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000067/2023-2024 1962/BWD 25/04/2023 0 Resource Division 31.52 0.00 0 0
4 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New New service connection charges for Dhenria PWSS TW-1 BILL/01418/2023-2024 BP-2023-24-147 31/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
5 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New New service connection charges for Dhenria PWSS TW-2 BILL/01473/2023-2024 BP-2023-24-167 27/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.71 0.00 0 0
6 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DHENRIA Water Supply Scheme [ Block-BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000559/2023-2024 3872/CMD 17/08/2023 30 M/S, S.S. ENTERPRISE. 27.79 0.00 0 90
7 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
8 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000782/2023-2024 325/BWD 24/01/2024 0 Resource Division 6.44 0.00 0 0
9 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENRIA, MAHATA, DEBPUR Piped Water Supply Scheme under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000019/2023-2024 1737/BWD 13/04/2023 993 M/S B. RAI CONSTRUCTION COMPANY 1,643.39 0.00 0 81
10 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day. [PeriodFebruary.'2025 to April'2025] ORD/001180/2024-2025 129/DSD 29/01/2025 78 MD HASIN 1.00 0.00 0 0
11 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period NOV.'2024 to JAN.'2025] ORD/000847/2024-2025 886/DSD 21/10/2024 78 MD HASIN 1.00 0.00 0 0
Total 1,845.30 0.00 0