Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 2,879.24 77.89 2.71  
1 PURBA BARDHAMAN Raina-I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Udgara Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000712/2023-2024 4023/CMD 29/08/2023 30 CHATTERJEE ENTERPRISE 28.95 0.00 0 0
2 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000207/2023-2024 2155/BWD 10/05/2023 0 Resource Division 9.24 0.00 0 0
3 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000535/2023-2024 4287/BWD 29/09/2023 0 Resource Division 4.57 0.00 0 0
4 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000699/2023-2024 5069/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
5 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHAGABATIPUR, MACHKHARA & UDGARA Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000690/2023-2024 4386/BWD 05/10/2023 365 SK ALIM 1,378.97 77.61 5.63 55
6 PURBA BARDHAMAN Raina-I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New New Service connection for Udgra W/S Scheme PH No.-I BILL/01799/2023-2024 BP-2023-24-310 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.13 0.00 0 0
7 PURBA BARDHAMAN Raina-I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New New Service connection for Udgram W/S Scheme PH No.-II BILL/01798/2023-2024 BP-2023-24-311 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.73 0.00 0 0
8 PURBA BARDHAMAN Raina-I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
9 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
10 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2024 to 31-01-2025) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000896/2024-2025 2438/BSD 29/10/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
11 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related (schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-05-2025 to 31-07-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000181/2025-2026 960/BSD 30/04/2025 66 PARVIN BEGAM 0.85 0.00 0 100
Total 2,879.22 77.89 2.71