Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 596.09 162.15 27.2  
1 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000227/2023-2024 2155/BWD 10/05/2023 0 Resource Division 8.19 0.00 0 0
2 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000545/2023-2024 4299/BWD 29/09/2023 0 Resource Division 9.65 0.00 0 0
3 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000650/2023-2024 5112/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.40 16.67 70
5 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
6 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Restoration Work of damage portion of the RIDF road from Bilbari to Farakpur for PHE pipe laying work within MEMARI-II BLOCK IN THE DISTRICT OF PURBABARDHAMAN BILL/00978/2024-2025 1052/JJM 13/11/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 23.03 0.00 0 0
7 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New New service connection for Bamunpukur PWSS TW 1. BILL/02439/2023-2024 BP-2023-24-524 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.99 0.00 0 0
8 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New New service connection for Bamunpukur PWSS of PH-1 BILL/02352/2023-2024 BP-2023-24-471 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.81 0.00 0 0
9 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Quotation for new service connection at Bamunpukur PWSS TW-2. BILL/00932/2024-2025 BP-2024-25-349 05/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.45 0.00 0 0
10 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New BAMUNPUKUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000112/2023-2024 2301/BWD 19/05/2023 866 MLG CONSTRUCTION 447.89 161.47 36.05 62
11 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bamunpukur Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000710/2023-2024 4021/CMD 29/08/2023 703 DUTTA ENTERPRISE 29.38 0.00 0 50
12 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related(schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-02-2025 to 30-04-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001402/2024-2025 240/BSD 31/01/2025 66 PARVIN BEGAM 0.85 0.28 32.94 100
Total 596.10 162.15 27.2