Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 1,041.58 275.07 26.41  
1 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000108/2023-2024 1965/BWD 26/04/2023 0 Resource Division 7.15 0.00 0 0
2 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000733/2023-2024 5235/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
3 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000196/2023-2024 2155/BWD 10/05/2023 0 Resource Division 5.01 0.00 0 0
4 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New New service connection charges for Saranga PWSS TW-2 BILL/00800/2023-2024 BP-2023-24-87 26/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.97 0.00 0 0
5 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New New service connection charges for Saranga PWSS TW-1 BILL/00818/2023-2024 BP-2023-24-94 02/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.50 0.00 0 0
6 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Continuation order-Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven ) for supervision of site for the office of the Assistant Engineer,under CMD,PHE,Dte. [W.e.f-01/03/2024 to 29/04/2024) ASSISTANT ENGINEER Junior Engineer ORD/001914/2023-2024 359/CMSD 27/02/2024 60 SUBRATA BHADRA 0.79 0.79 100 100
7 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & delivery of submersible pumping machinery (for urgent FHTC) for Tube well no.-1 at Saranga w/s scheme, (Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001663/2023-2024 1075/CMSD 15/12/2023 12 SUBHRA ENTERPRISE 0.67 0.67 100 100
8 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & delivery of different electro-mechanical accessories (for urgent FHTC) for Tube well no.-1 at Saranga w/s scheme, ( Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001664/2023-2024 1073/CMSD 15/12/2023 10 SUBHRA ENTERPRISE 0.80 0.77 96.25 100
9 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Emergency Installation (for urgent FHTC) of departmental supply submersible pumping machinery with supply main switch, cable, starter etc. for Tube well no.-1 at Saranga w/s scheme, ( Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001666/2023-2024 06/CMSD 02/01/2024 10 SUBHRA ENTERPRISE 0.72 0.68 94.44 100
10 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SARANGA & KAMALPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000082/2023-2024 2078/BWD 04/05/2023 698 KHAN ENTERPRISE 820.73 249.61 30.41 42
11 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Balance work for providing Functional Household Tap Connection (FHTC) within command area SARANGA W/S. Scheme of Khandaghosh Block under Burdwan Divn., PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001097/2024-2025 431/BWD 20/01/2025 120 ANWESHA CONSTRUCTION 98.39 0.00 0 0
12 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
13 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Saranga Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000144/2023-2024 2854/CMD 05/07/2023 30 ORIENTAL ENGINEERING CO. 28.97 22.55 77.84 100
Total 1,041.58 275.08 26.41