Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 657.7 335.15 50.96  
1 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000073/2023-2024 1962/BWD 25/04/2023 Resource Division 3.93 0.00 0 0
2 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000175/2023-2024 2155/BWD 10/05/2023 Resource Division 13.07 0.00 0 0
3 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New New service connection charges for Guir PWSS TW-2 BILL/00799/2023-2024 BP-2023-24-84 26/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.96 0.00 0 0
4 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New New service connection charges for Guir PWSS TW 1 BILL/00817/2023-2024 BP-2023-24-96 02/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.97 0.00 0 0
5 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000716/2023-2024 5268/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
6 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Guir Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000142/2023-2024 2855/CMD 05/07/2023 30 M/S GHOSH ENTERPRISE 28.95 11.30 39.03 90
7 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day [Period February'2024 to April'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001233/2023-2024 91/DSD 31/01/2024 78 MD HASIN 1.00 0.00 0 0
8 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New GUIR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000018/2023-2024 1732/BWD 13/04/2023 365 UNIQUE AGENCY 531.21 323.85 60.96 40
9 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period May'2024 to July'2024] ORD/000255/2024-2025 369/DSD 30/04/2024 78 MD HASIN 1.00 0.00 0 0
10 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
Total 657.70 335.14 50.96