Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
19 3,649.24 39.92 1.09  
1 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Augmentation of SAJIARA Piped Water Supply Scheme with LDS, Rising Main, Switch Room (with & without water supply & sanitary arrangements), Construction 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Construction of Boundary wall under Kalna Sub-Division, Block - Purbasthali - II, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000432/2021-2022 645/BWD 01/02/2022 360 UNICON INDIA 318.07 14.00 4.4 0
2 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Preparation of DPR for augmentation of Sajiara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-D) Assistant Engineer ORD/000516/2021-2022 184/KSD 21/02/2022 21 M/S R. DUTTA & CO. 2.88 2.88 100 1
4 PURBA BARDHAMAN Central Mechanical Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Sajiara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000064/2023-2024 2567/CMD 06/06/2023 30 AMUSAR IMPEX PVT. LTD. 21.95 0.00 0 0
5 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Work Order for "Construction of Pump house cum chlorine room without sanitary (Size 3.60 mtr x 3.00 mtr room) at 2nd Tube well site for augmentation of Sajiara Water Supply Scheme for providing Functional Household Tap Connection (FHTC) within Kalna Sub-Division under Burdwan Division, PHE Dte.^". JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000552/2023-2024 1307/KSD 23/08/2023 60 BUILD-TECH 3.02 0.00 0 0
6 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Construction of boundary wall of SAJIARA Piped water supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Length -150 Mtr, No of Columns-43 Nos. Centre to Centre- 3.5 Mtr.) With Double Tie Beam. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000598/2023-2024 4172/BWD 21/09/2023 30 HAIDER ALI MONDAL 14.53 0.00 0 0
7 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000031/2021-2022 546/BWD 27/01/2022 Resource Division 15.25 0.00 0 0
8 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000147/2021-2022 1244/BWD 07/03/2022 Resource Division 2.64 0.00 0 0
9 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000171/2021-2022 1339/BWD 08/03/2022 Resource Division 53.75 0.00 0 0
10 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000241/2021-2022 1565/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
11 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000077/2021-2022 609/BWD 28/01/2022 Resource Division 24.12 0.00 0 0
12 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000021/2022-2023 3274/BWD 29/07/2022 Resource Division 34.57 0.00 0 0
13 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Construction of Pump House cum chlorine room with sanitary and water supply arrangement at Head Work Site for augmentation of SAJIARA according to departmental drawing No-PHE/BD/P.H/DRG-01/DEC-2017 (Size 3.30 mtr x 3.60 mtr room with 1.2 Mtr. wide verandah) to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000964/2023-2024 5713/BWD 29/12/2023 60 DEL DELTA CONSTRUCTION 5.20 0.00 0 0
14 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Quotation from WBSEDCL for Load Enhancement charges of Sajiara water supply scheme of PH-1. under Burdwan Division, PHE Dte. BILL/01725/2023-2024 1402/JJM 29/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.32 0.00 0 0
15 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Work Order for "Construction of Pump house cum chlorine room without sanitary (Size 3.60 mtr x 3.00 mtr room) at 2nd Tube well site for augmentation of Sajiara Water Supply Scheme for providing Functional Household Tap Connection (FHTC) within Kalna Sub-Division under Burdwan Division, PHE Dte.^". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000559/2023-2024 1307/KSD 23/08/2023 60 BUILD-TECH 3.02 0.00 0 0
16 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Laying distribution system for augmentation of SAJIARA W/S Scheme to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000512/2023-2024 3554/BWD 11/08/2023 45 SK RAJU 42.39 16.23 38.29 40
17 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for SAJIARA Piped Water Supply Scheme, Block - Purbasthali - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000012/2022-2023 1960/BWD 12/04/2022 45 ACME CONSTRUCTION 14.81 6.81 45.98 50
18 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Different types of works involve in connection with Augmentation of SAJIARA (SM/09716), NAMA BHANDARTIKURI (SM/14917) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000394/2024-2025 3010/BWD 02/08/2024 120 PRATIMA CONSTRUCTION 79.16 0.00 0 2
19 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Laying of Rising Main for Augmentation of SAJIARA Piped Water Supply Scheme to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000597/2023-2024 3766/BWD 29/08/2023 30 CHOWDHURY CONSTRUCTION 8.19 0.00 0 2
Total 3,649.24 39.92 1.09