Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 664.62 346.27 52.1  
1 PURBA BARDHAMAN Ausgram-II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000078/2022-2023 1255/BWD 17/03/2023 0 Resource Division 8.72 0.00 0 0
2 PURBA BARDHAMAN Ausgram-II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000093/2022-2023 1629/BWD 06/04/2023 0 Resource Division 0.41 0.00 0 0
3 PURBA BARDHAMAN Ausgram-II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000635/2023-2024 5091/BWD 23/11/2023 0 Resource Division 21.70 0.00 0 0
4 PURBA BARDHAMAN Ausgram-II Central Mechanical SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New New service connection charges for Sonaiaima PWSS TW-2 BILL/00775/2023-2024 BP-2023-24-99 02/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.06 0.00 0 0
5 PURBA BARDHAMAN Ausgram-II Central Mechanical SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New New service connection charges for Sonaiaima PWSS TW-1 BILL/00720/2023-2024 BP-2023-24-46 13/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.13 0.00 0 0
6 PURBA BARDHAMAN Ausgram-II Central Mechanical SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sonaiaima Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000041/2023-2024 2493/CMD 01/06/2023 30 CHATTERJEE ENTERPRISE 27.71 21.70 78.31 40
7 PURBA BARDHAMAN Ausgram-II Durgapur W/S Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000017/2024-2025 1724/B/DWSD 10/12/2024 0 Resource Division 7.42 0.00 0 0
8 PURBA BARDHAMAN Ausgram-II Central Mechanical SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 80
9 PURBA BARDHAMAN Ausgram-II Durgapur W/S Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New FOMAL WORK ORDER FOR Balance works related (Sinking of Tube Wells at Bilaspur Village, LDS, Rising Mains, FHTCs, Road restoration of Sonaiaima PWSS under Ausgram-II Block under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_2 ORD/000221/2024-2025 128/DWSD 22/01/2025 120 RANADHIR SINHA 131.08 0.00 0 30
10 PURBA BARDHAMAN Ausgram-II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New SONAIAIMA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under AUSGRAM-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000639/2022-2023 254/BWD 16/01/2023 806 RANADHIR SINHA 360.13 324.57 90.13 100
Total 664.62 346.27 52.1