Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 22,075.32 0 0  
1 BIRBHUM Labpur Birbhum Division LAYEKPUR PIPED WATER SUPPLY SCHEME , SM/18361 New Continuation work for "Preparation & Submission of Detail Project Report (DPR) for LAYEKPUR Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". AE JE3 ORD/000948/2022-2023 237/BSD 17/06/2022 180 APEX ENGINEERING 4.92 0.00 0 100
2 BIRBHUM Labpur Birbhum Division LAYEKPUR PIPED WATER SUPPLY SCHEME , SM/18361 New Continuation work for "Preparation & Submission of additional Detail Project Report (DPR) for LAYEKPUR Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". AE JE3 ORD/000953/2022-2023 300/BSD 10/08/2022 90 APEX ENGINEERING 2.46 0.00 0 100
3 BIRBHUM Labpur Birbhum Division LAYEKPUR PIPED WATER SUPPLY SCHEME , SM/18361 New Construction of 400 Cum. OHR with Soil Investigation,Pump Room/Chlorine Room with sanitary arrangement,Laying of Rising Main Distribution System with FHTC and different works related to LAYEKPUR PIPED WATER SUPPLY SCHEME (TSM/016003) within LABPUR Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte. Assistant Engineer JE3 ORD/000186/2024-2025 2771/BHM 30/09/2024 365 SS ENTERPRISE 663.03 0.00 0 0
4 BIRBHUM Labpur Central Drilling LAYEKPUR PIPED WATER SUPPLY SCHEME , SM/18361 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
5 BIRBHUM Labpur Bolpur Mechanical LAYEKPUR PIPED WATER SUPPLY SCHEME , SM/18361 New Construction of Tube Well (300 MM x 200 MM x Depth 450 Mtr) for Layekpur PWSS (TW No III), Block- Labpur, in Birbhum District under Bolpur Mechanical Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/001134/2024-2025 334/BOL.MD 19/02/2025 120 M/S. UTTAM KUMAR CHATTERJEE 37.24 0.00 0 0
6 BIRBHUM Labpur Birbhum Division LAYEKPUR PIPED WATER SUPPLY SCHEME , SM/18361 New Road restoration work for Layekpur Piped Water Supply Scheme, Labpur Block, under Birbhum Division, PHE Dte. Assistant Engineer JE3 ORD/000250/2025-2026 2242/BHM 29/08/2025 90 ARUP HAZRA 27.91 0.00 0 0
Total 22,075.33 0.00 0