Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 24,418.21 0 0  
1 BIRBHUM Illambazar Birbhum Division Bhabani Water Supply Scheme , SM/18351 New Continuation Work Order for "Preparation & Submission of Detail Project Report (DPR) for BHABANIPUR Piped Water Supply Scheme under command area of Illambazar Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". (PART - B) AE ORD/000766/2022-2023 280/BSD 22/07/2022 90 M/S R DUTTA & CO. 4.29 0.00 0 100
2 BIRBHUM Illambazar Birbhum Division Bhabani Water Supply Scheme , SM/18351 New Continuation Work Order for "Preparation & Submission of Detail Project Report (DPR) for BHABANIPUR Piped Water Supply Scheme under command area of Illambazar Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". (PART - A) AE ORD/000765/2022-2023 176/BSD 29/04/2022 90 M/S R DUTTA & CO. 4.93 0.00 0 100
3 BIRBHUM Illambazar Bolpur Mechanical Bhabani Water Supply Scheme , SM/18351 New New service connection at Bhabanipur PWSS P.H.- I (Block- Illambazar) BILL/00157/2024-2025 BP-2024-2025-86 14/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.93 0.00 0 0
4 BIRBHUM Illambazar Central Drilling Bhabani Water Supply Scheme , SM/18351 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
5 BIRBHUM Illambazar Birbhum Division Bhabani Water Supply Scheme , SM/18351 New Different works related to water supply scheme at DHANASAHA, CHHATAR-BANDI, BHABANIPUR, BHUBANESWAR Piped Water Supply Scheme within ILLAMBAZAR Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte AE JE1 ORD/000384/2023-2024 4141/BHM 19/10/2023 709 B RAI CONSTRUCTION COMPANY 2,996.46 0.00 0 5
6 BIRBHUM Illambazar Birbhum Division Bhabani Water Supply Scheme , SM/18351 New Wall writing on smooth wall surface (preferably of Govt. premises/Boundary Wall) by cleaning the surface thoroughly, removing old paint, preparing with one coat good quality exterior primer and Two cost best quality exterior synthetic enamel paint of approved shed and writing IEC message along with logo, picture etc. of multiple color as will be supplied by PHE Dte. by engaging skilled artist and helper artist in different location within the district of Birbhum all completed as per direction of EIC. (Size- 8'-4') 2215 nos. village (2 nos. each) AE Estimator,JE ORD/000492/2024-2025 203/BHM 16/01/2025 90 IMAGIN 67.84 0.00 0 100
Total 24,418.22 0.00 0