Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 2,100.1 2.53 0.12  
1 BIRBHUM Labpur Birbhum Division RANIPARA PIPED WATER SUPPLY SCHEME , SM/16276 New Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for RANIPARA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." AE JE3 ORD/000659/2022-2023 185/BSD 11/05/2022 180 APEX ENGINEERING 3.52 2.53 71.88 100
2 BIRBHUM Labpur Birbhum Division RANIPARA PIPED WATER SUPPLY SCHEME , SM/16276 New Material Requisition To Resource Division RTOR000013/2024-2025 2396/BHM 27/08/2024 0 Resource Division 5.40 0.00 0 0
3 BIRBHUM Labpur Birbhum Division RANIPARA PIPED WATER SUPPLY SCHEME , SM/16276 New Construction of Different capacity O.H.R.,with Soil investigation, 5.90 m X 4.10 mPump room/ Chlorine room with sanitary arrangements, and laying of Rising main,Distribution system, with FHTC .and Construction of boundary wall including approach road and land development at Head work site and 2 nd under different (6 nos).PIPED WATER SUPPLY SCHEME within LABPUR Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte. AE,Assistant Engineer JE,JE1,JE3 ORD/000084/2024-2025 1948/BHM 04/07/2024 730 UMWELT ENGINEER PVT. LTD. 2,014.73 0.00 0 0
4 BIRBHUM Labpur Bolpur Mechanical RANIPARA PIPED WATER SUPPLY SCHEME , SM/16276 New Construction of Tube Well (300 MM x 200 MM x Depth 450 Mtr) for Ranipara PWSS (TW No I and II), Block- Labpur, in Birbhum District under Bolpur Mechanical Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/001129/2024-2025 335/BOL.MD 19/02/2025 120 SATYAJIT GHOSH 76.45 0.00 0 7
Total 2,100.09 2.53 0.12