Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 5,389.18 1.19 0.02  
1 BIRBHUM Khoyrasol Birbhum Division Aliat Piped Water Supply Scheme , SM/14083 New Material Requisition To Resource Division RTOR000232/2023-2024 440/BHM 01/02/2024 Resource Division 109.46 0.00 0 0
2 BIRBHUM Khoyrasol Birbhum Division Aliat Piped Water Supply Scheme , SM/14083 New Preparation & Submission of DPR for Aliat & its adjoining mouzas Piped Water Supply Scheme under Khayrasole Development Block. AE JE ORD/000683/2022-2023 142/BSSD 21/07/2022 45 RADIANT 2.37 1.19 50.21 100
3 BIRBHUM Khoyrasol Birbhum Division Aliat Piped Water Supply Scheme , SM/14083 New Construction of 19 nos. 50 Cum capacity CWR and 1 no. 100 Cum capacity CWR with Soil Investigation for all & Construction of Boundary Wall and Rising Main Pipe line for 20 nos. PWSS at Khoyrasol block under Birbhum Division, PHE Dte. AE JE ORD/000083/2024-2025 1851/BHM 19/06/2024 365 LUMINO SMC JV 1,056.10 0.00 0 0
4 BIRBHUM Khoyrasol Birbhum Division Aliat Piped Water Supply Scheme , SM/14083 New Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & Different works including Laying of Distribution System, providing FHTCs and construction of switch rooms & Boundary wallswith gates in connection with Sub Surface based water Supply Scheme (Zone-I to XX) at Khayrasole Block under Birbhum Division, PHE Dte., District:-Birbhum. AE JE ORD/000392/2023-2024 4123/BHM 17/10/2023 365 LUMINO SMC JV 4,221.25 0.00 0 2
Total 5,389.18 1.19 0.02