Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 21,464.63 31.86 0.15  
1 MURSHIDABAD Beldanga-II Berhampore Division I SHUKUR PUKUR PWSS , SM/16782 New Material Requisition To Resource Division RTOR000047/2023-2024 61/BD-1/34 27/04/2023 0 Resource Division 8.65 0.00 0 0
2 MURSHIDABAD Beldanga-II Berhampore Division I SHUKUR PUKUR PWSS , SM/16782 New Material Requisition To Resource Division RTOR000024/2024-2025 2096/BD-I/5 25/11/2024 0 Resource Division 3.70 0.00 0 0
3 MURSHIDABAD Beldanga-II Berhampore Mechanical SHUKUR PUKUR PWSS , SM/16782 New NEW CONNECTION AT SUKURPUKUR PH-1 BILL/00616/2024-2025 183/WBSEDCL-JJM 09/08/2024 0 WBSEDCL 10.55 0.00 0 0
4 MURSHIDABAD Beldanga-II Central Drilling SHUKUR PUKUR PWSS , SM/16782 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 17.30 0.08 11
5 MURSHIDABAD Beldanga-II Berhampore Division I SHUKUR PUKUR PWSS , SM/16782 New SHUKUR PUKUR PWSS to accommodate construction of Pump House Cum Chlorine Room, boundary wall and service road, under Jal Jivan Mission of Beldanga-II Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-II JE_RAJIB BISWAS ORD/000087/2023-2024 207/BD-I 17/05/2023 865 ABIDA CONSTRUCTION 40.82 0.00 0 51
6 MURSHIDABAD Beldanga-II Berhampore Division I SHUKUR PUKUR PWSS , SM/16782 New SHUKUR PUKUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising main under Jal Jivan Mission of BELDANGA - II Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-II JE_RAJIB BISWAS ORD/000133/2023-2024 612/BD-I 02/08/2023 697 NOVELTY CONSTRUCTION 52.15 14.56 27.92 60
7 MURSHIDABAD Beldanga-II Berhampore Division I SHUKUR PUKUR PWSS , SM/16782 New Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SUKURPUKUR Water Supply Scheme(2nd TW Site) within Beldanga-II Block under JJM in connection with Augmentation work under Berhampore Division-I, P.H.Engineering Dte. Assistant Engineer-II JE_RAJIB BISWAS ORD/000323/2024-2025 262/BD-I 07/02/2025 183 SINGHA AND CO. 9.00 0.00 0 100
Total 21,464.63 31.85 0.15