Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 21,705.63 46.06 0.21  
1 MURSHIDABAD Beldanga-II Berhampore Division I HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New Material Requisition To Resource Division RTOR000029/2023-2024 61/BD-1/16 27/04/2023 0 Resource Division 12.25 0.00 0 0
2 MURSHIDABAD Beldanga-II Berhampore Division I HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New Material Requisition To Resource Division RTOR000021/2024-2025 2096/BD-I/2 25/11/2024 0 Resource Division 5.01 0.00 0 0
3 MURSHIDABAD Beldanga-II Berhampore Mechanical HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New NEW CONNECTION AT HARIGANJ PH-I BILL/00614/2024-2025 184/WBSEDCL-JJM 09/08/2024 0 WBSEDCL 5.15 0.00 0 0
4 MURSHIDABAD Beldanga-II Berhampore Mechanical HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well in connection to Accommodate FHTC at Pump House No.-III under HARIGANJA ground water based water supply scheme under Block_LALGOLA Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000023/2025-2026 1152/MEDB 14/05/2025 92 ASSOCIATED ELECTRICAL CO. 10.83 0.00 0 0
5 MURSHIDABAD Beldanga-II Berhampore Division I HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New HARIGANJA PWSS to accommodate FHTC, OHR, Laying Distribution System, Rising Main under Jal Jeevan Mission of BELDANGA - II Block, Murshidabad District under Berhampore Division-I, PHE Dte. Assistant Engineer-II JE_RAJIB BISWAS ORD/000043/2023-2024 74/BD-I 28/04/2023 730 M/S SAJEDA ENTERPRISE 141.80 26.50 18.69 65
6 MURSHIDABAD Beldanga-II Central Drilling HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 5.56 0.03 11
7 MURSHIDABAD Beldanga-II Berhampore Division I HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New HARIGANJA PWSS to accommodate construction of Pump House Cum Chlorine Room, boundary wall and service road, under Jal Jivan Mission of Beldanga-II Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-II JE_RAJIB BISWAS ORD/000284/2023-2024 1001/BD-I 31/10/2023 90 SUSHANTA MANDAL 39.10 14.00 35.81 31
8 MURSHIDABAD Beldanga-II Berhampore Division I HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New Planning,Design,Investigation,Construction,Erection,Installation,Completion testing and Commissioning in all respect of entire units of Arsenic cum Iron Removal Plant (AIRP) of different capacities capable of removing arsenic & Iron Present in Ground Water in different concentration to acceptable limit as per latest BIS Code on basis of departmental process drawing (MODIFIED SUJAPUR SADIPUR) along with 5 (Five) years Operation & Maintenance after successful completion of 3 (three) months Trial Run of "Hariganja" ground water supply scheme in Beldanga-II Block, under Berhampore Division-I, P.H.E Dte. (Capacity-30 Cum/hr.) Type-4- Partial Gravity System with Pressure Filter and Pressurized Upflow Polishing Unit Assistant Engineer-II JE_RAJIB BISWAS ORD/000029/2024-2025 992/BD-I 20/06/2024 365 NATIONAL CONSTRUCTION 142.73 0.00 0 5
9 MURSHIDABAD Beldanga-II Berhampore Division I HARIGANJA AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME , SM/16377 New Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at HARIGANJ PWSS (H/W Site) under Jal Jeevan Mission in Beldanga-II Block under Berhampore Division - I, P.H.Engineering Dte. in the district of Murshidabad. (01 Nos TW) Assistant Engineer-II ORD/000381/2024-2025 443/BD-I 20/03/2025 15 M/S S. DAS & ENTERPRISE 9.00 0.00 0 0
Total 21,705.63 46.06 0.21