Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 1,597.53 155.87 9.76  
1 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation Material Requisition To Resource Division RTOR000009/2023-2024 61/BD-1/8 27/04/2023 0 Resource Division 29.20 0.00 0 0
2 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation NEW SERVICE CONNECTION AT KOMNAGAR PH 1 ID 304268985 BILL/01130/2024-2025 26/11/2024 0 WBSEDCL 3.49 0.00 0 0
3 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation Providing and installation of Electro_Mechanical equipment and Allied works for Arsenic Iron Removal Plant at Komnagar ground water supply scheme in Raninagar-II Block Dist_Murshidabad under MEDB PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000009/2025-2026 1133/MEDB 13/05/2025 92 M/S K.P. PRAMANIK 39.98 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation Augmentation of Komnagar Piped water supply scheme to accommodate construction of OHR , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Raninagar-II Block of Murshidabad District under Berhampore Division-I,PHE.Dte. Assistant Engineer Junior Engineer-II ORD/000122/2023-2024 506/BD-I 24/07/2023 647 PRATICHI ENTERPRISE 194.85 130.92 67.19 83
5 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation Planning, Design, Investigation, Construction, Erection, Installation, Completion testing and Commissioning in all respect of entire units of Arsenic cum Iron Removal Plant (AIRP) of different capacities capable of removing arsenic & Iron Present in Ground Water in different concentration to acceptable limit as per latest BIS Code manual on basis of departmental process drawing (MODIFIED SUJAPUR SADIPUR) ALONG WITH 3 (Three) years operation & Maintenance after succesful completion of 3 (Three) months Trial Run of "Augmentation of Komnagar ground water supply scheme in Raninagar-II Block, under Berhampore Division-I, P.H.E. Dte. (Capacity-30.00 Cum/Hr.) Assistant Engineer ORD/000288/2024-2025 56/BD-I 14/01/2025 300 SUMAN ENTERPRISE AND SUMAN AQUA 122.79 0.00 0 0
6 MURSHIDABAD Central Drilling Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation Construction of Big diameter Tube-Well by Deployment of Suitable capacity Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different District for Different Water Supply Schemes Including Procurement & Installation Pumping machinery with All Allied accessories at the Above Constructed Tube - Wells under JJM Program throughout the State of West Bengal. (2nd call of NIET 25 of 2022-23). Assistant Engineer,Driller In Charge Junior Engineer ORD/000022/2024-2025 492/CDD 23/07/2024 92 JHARGRAM SPV PRIVATE LIMITED 458.70 7.53 1.64 10
7 MURSHIDABAD Central Drilling Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) ORD/000215/2023-2024 2235/CDD 11/03/2024 153 JHARGRAM SPV PRIVATE LIMITED 720.23 14.93 2.07 20
8 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation Construction of Boundary Wall With Main Entrance gate and barbed wire facing ,Service Road for approach and Pump House at Augmentation of Komnagar PWSS of Raninagar-II Block under Jal Jeevan Mission of Murshidabad District under Berhampore Division-I, PHE Dte. (2nd Site)/New OHR Site Assistant Engineer Junior Engineer-II ORD/000053/2024-2025 1119/BD-I 11/07/2024 335 MODERN CONSTRUCTION (DOMKAL) 25.76 0.00 0 75
9 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . , SM/14049 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for KOMNAGAR Water Supply Scheme of RANINAGAR-II Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE_Pravin Kumar Gupta ORD/000279/2022-2023 1763/BD-I 24/03/2023 10 M/S SOBHA & CO 2.53 2.49 98.42 100
Total 1,597.53 155.87 9.76