Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 821.14 0 0  
1 MURSHIDABAD Raghunathganj - I Murshidabad Division CHARKA PIPE WATER SUPPLY SCHEME. , SM/18465 New Material Requisition To Resource Division RTOR000269/2023-2024 1230/MURD/13 04/05/2023 Resource Division 33.69 0.00 0 0
2 MURSHIDABAD Raghunathganj - I Murshidabad Division CHARKA PIPE WATER SUPPLY SCHEME. , SM/18465 New CHARKA PWSS to accommodate FHTC under Jal Jeevan Mission of Murshidabad District under Raghunathganj-I Block, Jangipur Sub Division of Murshidabad Division, PHE.Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000199/2023-2024 2058/MURD 27/07/2023 280 DECON INDIA 482.22 0.00 0 0
3 MURSHIDABAD Raghunathganj - I Murshidabad Division CHARKA PIPE WATER SUPPLY SCHEME. , SM/18465 New Preparation of DPR for drinking water supply scheme to facilitate 63 Nos (List Enclosed) Uncovered mouzas of Jangipur Sub-Division [Raghunathganj-I, Raghunathganj-II, Suti-I, Suti-II, Farakka, Samserganj Block] which includes Route survey using DGPS/Drone/Total Station etc. & all related field work for technical data collection, Household Survey using PHED developed mobile application, Preparation and supply of Geo reference drawing / layout plan of the zone-wise Command area of water distribution and transmission Pipeline network of the schemes showing all requisite features, design of Pipeline Network. Design (if necessary), drawing & estimation of all necessary structures, Preparation & Submission of DPR booklets & Bid Document ( in both hard and soft copies) including Preparation of Booklet for SLSSC for individual PWSS, all complete in consultation with the EIC under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000578/2022-2023 3001/MURD 11/11/2022 45 RADIANT 253.25 0.00 0 100
4 MURSHIDABAD Raghunathganj - I Berhampore Mechanical CHARKA PIPE WATER SUPPLY SCHEME. , SM/18465 New Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well in connection to Accommodate FHTC at Pump House No.-I ,II & III under CHARKA ground water based water supply scheme under Block_ Raghunathganj-I Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000680/2023-2024 4302/MEDB 29/12/2023 90 DEBJYOTI BASU 33.53 0.00 0 0
5 MURSHIDABAD Raghunathganj - I Murshidabad Division CHARKA PIPE WATER SUPPLY SCHEME. , SM/18465 New Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at CHARKA Water Supply Scheme at Head Work Site, 2nd Site site at Raghunathganj ¿ I Block under Murshidabad Division, P.H. Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000272/2023-2024 2603/MURD 22/08/2023 21 MAMATA USHA ENTERPRISE 18.45 0.00 0 0
Total 821.13 0.00 0