Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 22,080.57 28.13 0.13  
1 MURSHIDABAD Murshidabad Division AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Material Requisition To Resource Division RTOR000069/2022-2023 1004/MURD/9 11/04/2023 Resource Division 66.52 0.00 0 0
2 MURSHIDABAD Murshidabad Division AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Material Requisition To Resource Division RTOR000030/2023-2024 1043/MURD 17/04/2023 Resource Division 37.46 0.00 0 0
3 MURSHIDABAD Murshidabad Division AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Laying Distribution System & FHTC, for Augmentation of Kagram water supply scheme of Bharatpur-II Block under Murshidabad Division, PHE Dte. PART_B ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000050/2023-2024 1232/MURD 04/05/2023 365 M/S NIRAPADA BHATTACHARJEE 272.58 0.00 0 0
4 MURSHIDABAD Murshidabad Division AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Preparation of D.P.R Consultancy work ( Augmentation/With Retrofitting/Retrofitting Only) in connection with the Functional House Hold Tap Connection of 12(Twelve) Nos Existing commissioned PWSS of Kandi Sub-Division under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/001470/2021-2022 285/MURD 03/02/2022 60 GEOTECHNICAL ENGINEERS CONSORTIUM (PROP:MANASIJ DUTTA) 89.28 5.60 6.27 76
5 MURSHIDABAD Murshidabad Division AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Material Requisition To Resource Division RTOR000359/2023-2024 MURD/439/04 08/02/2024 Resource Division 4.10 0.00 0 0
6 MURSHIDABAD Murshidabad Division AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Wall writing on smooth, durable wall surface (preferably of Govt. premises/Boundary wall) by cleaning the surface thoroughly, removing old paints, preparing with one coat good quality exterior primer and painting the surface with best quality synthetic enamel paint of approved shed and writing IEC message along with logo, picture etc of multiple colour as will be supplied by PHE Dte. by engaging skilled artist and helper artist in different location within the district of Murshidabad all complete as per direction of EIC. ASSISTANT ENGINEER (HQ) JUNIOR ENGINEER ORD/000794/2023-2024 517/MURD 16/02/2024 60 IMAGIN 97.48 0.00 0 80
7 MURSHIDABAD Berhampore Mechanical AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation NEW CONNECTION AT KAGRAM PH-III BILL/00231/2024-2025 68/WBSEDCL-JJM 09/05/2024 WBSEDCL 5.22 0.00 0 0
8 MURSHIDABAD Murshidabad Division AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Construction of 300 Cum OHR, Pump House, Boundwary Wall, Rising Main Connection & Repairing work of Existing OHR, Boundwary Wall , Pump House for Augmentation of Kagram water supply scheme of Bharatpur-II Block under Murshidabad Division, PHE Dte. PART_A ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000019/2023-2024 992/MURD 11/04/2023 365 DALIM BISWAS ENTERPRISE 157.49 22.53 14.31 15
9 MURSHIDABAD Murshidabad Division AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Sinking of 01 (One) No. of 300 mm x 200 mm dia tube well i.e. TW-III of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Kagram & adjoining mouzas Water Supply Scheme at 3rd work site at B h a r a t p u r - I I Block under Murshidabad Division, P.H. Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000048/2023-2024 1102/MURD 24/04/2023 20 INDRAJIT MAZUMDAR 10.68 0.00 0 0
10 MURSHIDABAD Central Drilling AUGMENTATION OF KAGRAM WATER SUPPLY SCHEME BLOCK- BHARATPUR -II , DIST- MURSHIDABAD. , SM/16179 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 22,080.60 28.13 0.13