Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 420.41 104.69 24.9  
1 MALDAH Kaliachak - III Malda Ars Area W/S Division Bakhrabad Mouza piped water supply Scheme of Kaliachak-III block under Malda Arsenic Area water supply Division, PHED , SM/15944 New Material Requisition To Resource Division RTOR000004/2023-2024 626/MAAD 05/04/2023 Resource Division 6.21 0.00 0 0
2 MALDAH Kaliachak - III Malda Mechanical Bakhrabad Mouza piped water supply Scheme of Kaliachak-III block under Malda Arsenic Area water supply Division, PHED , SM/15944 New Supply, delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I and Arsenic Iron Removal Plant at Bakhrabad Piped Water Supply Scheme in the district of Malda Under Malda Mechanical Division, PHE Dte. (TSM/017774) Assistant Engineer - II ORD/000663/2023-2024 2689/MLMD 11/08/2023 180 GHOSH BROTHERS... 49.58 0.00 0 0
3 MALDAH Kaliachak - III Malda Mechanical Bakhrabad Mouza piped water supply Scheme of Kaliachak-III block under Malda Arsenic Area water supply Division, PHED , SM/15944 New W.B.S.E.D.C.LTD Quotation charge at P/H No.I of Bakhrabad PWSS, Golapganj C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II Junior Engineer-03 ORD/001908/2023-2024 3004379428 01/08/2023 90 W.B.S.E.D.C.LTD 2.27 1.13 49.78 100
4 MALDAH Kaliachak - III Malda Ars Area W/S Division Bakhrabad Mouza piped water supply Scheme of Kaliachak-III block under Malda Arsenic Area water supply Division, PHED , SM/15944 New Construction of Arsenic-cum-Iron Removal Plant (AIRP) at Bakrabad Piped Water supply scheme of Kaliachak-III Block under Malda Arsenic Area W/S Division, P.H.E.Dte. in the District of Malda.(2nd Call) Assistant Engineer-II Junior Engineer-III ORD/000361/2023-2024 51/MAAD 18/01/2024 365 WIST WATER SOLUTIONS PRIVATE LIMITED 131.25 0.00 0 0
5 MALDAH Kaliachak - III Malda Ars Area W/S Division Bakhrabad Mouza piped water supply Scheme of Kaliachak-III block under Malda Arsenic Area water supply Division, PHED , SM/15944 New Laying of Distribution System & others allied works at Char Bakrabad under Bakhrabad Piped Water supply scheme of Southern sector under Malda Arsenic Area W/S Division, P.H.E.Dte.(Kaliachak-III) Assistant Engineer-II Junior Engineer-III ORD/000134/2023-2024 1476/MAAD 01/08/2023 60 DEY CONSTRUCTION 65.47 55.26 84.41 80
6 MALDAH Kaliachak - III Malda Ars Area W/S Division Bakhrabad Mouza piped water supply Scheme of Kaliachak-III block under Malda Arsenic Area water supply Division, PHED , SM/15944 New Sinking of 250mm. Dia. x 150mm. big dia. Tube Well of 150 Mtr. deep by Direct Rotary Rig method using UPVC (CM) Pipes & UPVC Medium Well Screen (RMS) Pipes with Ribs at Bakhrabad Piped Water supply scheme of Kaliachak-III Block (Head work site) under Malda arsenic Area water supply Division in the disrtict of Malda. Assistant Engineer-II Junior Engineer-III ORD/000133/2023-2024 1475/MAAD 01/08/2023 45 MD. TALEB ALI 7.65 2.46 32.16 100
7 MALDAH Kaliachak - III Malda Ars Area W/S Division Bakhrabad Mouza piped water supply Scheme of Kaliachak-III block under Malda Arsenic Area water supply Division, PHED , SM/15944 New Laying of Distribution System & others allied works at Kumbhira under Bakhrabad Piped Water supply scheme of Southern sector under Malda Arsenic Area W/S Division, P.H.E.Dte.(Kaliachak-III) Assistant Engineer-II Junior Engineer-III ORD/000135/2023-2024 1477/MAAD 01/08/2023 60 S. R. CONSTRUCTION 63.18 31.24 49.45 95
8 MALDAH Kaliachak - III Malda Ars Area W/S Division Bakhrabad Mouza piped water supply Scheme of Kaliachak-III block under Malda Arsenic Area water supply Division, PHED , SM/15944 New Construction of 250 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design & Drawing including pipe connection, Soil Investigation and Providing Functional House Hold Tap Connection (FHTC) for Bakrabad Piped Water Supply scheme at Kaliachak-III Block under Malda Arsenic Area W/S Division, P.H.E. Dte, Malda. Assistant Engineer-II Junior Engineer-III ORD/000224/2023-2024 1733/MAAD 22/09/2023 270 MI CONSTRUCTION 94.80 14.60 15.4 60
Total 420.41 104.68 24.9