Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 946.33 40.86 4.32  
1 MALDAH Kaliachak - I Malda Ars Area W/S Division Alipur Mouza Piped Water Supply Scheme of Kaliachak-I Block under Malda Arsenic Area water Supply Division, PHE Dte , SM/15521 New Material Requisition To Resource Division RTOR000013/2023-2024 666/MAAD 11/04/2023 Resource Division 25.35 0.00 0 0
2 MALDAH Kaliachak - I Malda Mechanical Alipur Mouza Piped Water Supply Scheme of Kaliachak-I Block under Malda Arsenic Area water Supply Division, PHE Dte , SM/15521 New Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I , II & III and Arsenic Iron Removal Plant at Alipur Piped Water Supply Scheme in the district of Malda Under Malda Mechanical Division, PHE Dte Assistant Engineer - II ORD/000737/2023-2024 2614/MLMD 10/08/2023 180 DIPALI CONSTRUCTION. 86.14 0.00 0 0
3 MALDAH Kaliachak - I Malda Ars Area W/S Division Alipur Mouza Piped Water Supply Scheme of Kaliachak-I Block under Malda Arsenic Area water Supply Division, PHE Dte , SM/15521 New Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 3rd Tube Well site of Alipur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda Assistant Engineer-II Junior Engineer-II ORD/000259/2023-2024 2056/MAAD 22/11/2023 60 BINA CONSTRUCTION 5.02 0.00 0 0
4 MALDAH Kaliachak - I Malda Ars Area W/S Division Alipur Mouza Piped Water Supply Scheme of Kaliachak-I Block under Malda Arsenic Area water Supply Division, PHE Dte , SM/15521 New Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site of Alipur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-II Junior Engineer-II ORD/000260/2023-2024 2057/MAAD 22/11/2023 60 TARUN KANTI BAGCHI 5.02 0.00 0 0
5 MALDAH Kaliachak - I Malda Ars Area W/S Division Alipur Mouza Piped Water Supply Scheme of Kaliachak-I Block under Malda Arsenic Area water Supply Division, PHE Dte , SM/15521 New Construction of Arsenic-cum-Iron Removal Plant (AIRP) for Alipur Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. in the District of Malda.(2nd Call) Assistant Engineer-II Junior Engineer-II ORD/000261/2023-2024 2058/MAAD 22/11/2023 365 MERCURY ENGINEERING COMPANY 271.74 0.00 0 0
6 MALDAH Kaliachak - I Malda Ars Area W/S Division Alipur Mouza Piped Water Supply Scheme of Kaliachak-I Block under Malda Arsenic Area water Supply Division, PHE Dte , SM/15521 New Sinking of Three nos 250mm. Dia. x 150mm. big dia. Tube Well of 150 Mtr. deep by Direct Rotary Rig method using UPVC (CM) Pipes & UPVC Medium Well Screen (RMS) Pipes with Ribs for Alipur Piped Water supply scheme (Head Work Site, 2nd Tube well site & 3rd Tube well site) at Kaliachak-I Block under Malda Arsenic Area Water Supply Division , P.H.E. Dte., Malda. Assistant Engineer-II Junior Engineer-II ORD/000262/2023-2024 2055/MAAD 22/11/2023 45 M/S S.S. ENTERPRISE 22.17 7.16 32.3 100
7 MALDAH Kaliachak - I Malda Ars Area W/S Division Alipur Mouza Piped Water Supply Scheme of Kaliachak-I Block under Malda Arsenic Area water Supply Division, PHE Dte , SM/15521 New Laying of Distribution System for Alipur Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-I,Assistant Engineer-II Junior Engineer-II ORD/000379/2023-2024 281/MAAD 06/03/2024 90 SOFIQUL ISLAM 166.60 0.00 0 0
8 MALDAH Kaliachak - I Malda Ars Area W/S Division Alipur Mouza Piped Water Supply Scheme of Kaliachak-I Block under Malda Arsenic Area water Supply Division, PHE Dte , SM/15521 New Construction of 900 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design & Drawing including pipe connection, Soil Investigation and Providing Functional House Hold Tap Connection (FHTC) for Alipur Piped Water Supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E. Dte, Malda. (2nd Call) Assistant Engineer-II Junior Engineer-II ORD/000033/2023-2024 868/MAAD 04/05/2023 270 NEOGI ENTERPRISE 364.29 33.70 9.25 15
Total 946.34 40.86 4.32