Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 509.97 106.31 20.85  
1 MALDAH Malda Mechanical Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I & II and making compound lighting arrangement at head worksite ,Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering at T/W no. I of Adina Zone-I Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011889) Assistant Engineer - II ORD/000599/2023-2024 2719/MLMD 14/08/2023 2005 SUNRISE ENGINEERING CORPORATION. 28.74 0.00 0 0
2 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Acceptance cum formal work order for Route survey, design and preparation of DPR of Adina Zone-I Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ramen Karmakar, Junior Engineer ORD/000683/2021-2022 648/MD 22/03/2022 15 TECHVISION 3.04 3.01 99.01 1
3 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Material Requisition To Resource Division RTOR000075/2023-2024 1811/MD 27/04/2023 0 Resource Division 34.17 0.00 0 0
4 MALDAH Malda Mechanical Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation W.B.S.E.D.C.LTD Quotation charge at TW No- I of Adina Zone-I, Pandua CCC in the dist of Malda Under Malda Mechanical Division PHE Dte. BILL/03698/2023-2024 BP-2023-24-676 11/03/2024 0 W.B.S.E.D.C.LTD 8.67 0.00 0 0
5 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Formal work order for the work of Augmentation of ADINA ZONE-I Piped Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000119/2023-2024 2322/MD 08/06/2023 840 M/S TRILOCHAN CONSTRUCTION CO 348.95 103.12 29.55 35
6 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Continuation work order Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for Official use of the office of the Assistant Engineer, RWS Malda Sub-Division Division, PHE Dte. (Car-2) (Period from 15/12/2024 to 31/12/2024). Mr. Debasis Pal, Assistant Engineer Shreya Das, Junior Engineer ORD/001032/2024-2025 6291/MD 11/12/2024 17 RUQAIYA ENTERPRISE 0.08 0.18 225 0
7 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Design, Supplying, Fabrication, Erection & Commissioning including 3 (three) months Trial Run of 30m³/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room & backwash water disposal and Construction of Boundary wall at 2nd TW site, Approach Raod at HW & 2nd TW site at Adina Zone-I Water Supply Scheme of Gazole Block under Malda Division P.H.E Dte in the District of Malda. Sri Biswadip Sengupta, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000234/2025-2026 4238/MD 29/08/2025 150 VISCOUS ENGINEERS PVT. LTD. 45.87 0.00 0 0
8 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe & Providing FHTC for ADINA ZONE-I piped Water Supply Scheme at Gazole Dev. Block in the District of Malda under Malda Division, P.H.E.Dte. Sri Biswadip Sengupta, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000235/2025-2026 4518/MD 12/09/2025 60 M/S TRILOCHAN CONSTRUCTION CO 40.45 0.00 0 0
Total 509.97 106.32 20.85