Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
9 | 375.95 | 76.68 | 20.4 | ||||||||||||||
1 | MALDAH | Malda Division | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | Acceptance cum formal work order for Route survey, design and preparation of DPR of Alal Zone-III Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. | Mr. Arnab Giri, Assistant Engineer | Biswajit Gosh, Junior Engineer | ORD/000688/2021-2022 | 653/MD | 22/03/2022 | 15 | TECHVISION | 2.95 | 2.94 | 99.66 | 1 | |
2 | MALDAH | Malda Division | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | Material Requisition To Resource Division | RTOR000072/2023-2024 | 1811/MD | 27/04/2023 | Resource Division | 19.37 | 0.00 | 0 | 0 | ||||
3 | MALDAH | Malda Mechanical | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | Supply, installation, commissioning and Trial Operation of electro-mechanical components at T/W no I and Supply, installation, commissioning of electro-mechanical components at T/W no II and making compound lighting arrangement at head worksite ,Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering at headwork site of Alal Zone-III Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011885) | Assistant Engineer - II | ORD/000604/2023-2024 | 2721/MLMD | 14/08/2023 | 2005 | M/S TRILOCHAN CONSTRUCTION CO. | 24.32 | 0.00 | 0 | 0 | ||
4 | MALDAH | Malda Division | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | Material Requisition To Resource Division | RTOR000157/2023-2024 | 245/MD | 10/01/2024 | Resource Division | 4.42 | 0.00 | 0 | 0 | ||||
5 | MALDAH | Malda Division | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to Tube Well No 2 at ALAL ZONE-III Piped Water Supply Scheme under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. | Mr. Arnab Giri, Assistant Engineer | Amit Karmakar, Junior Engineer | ORD/000972/2023-2024 | 831/MD | 21/02/2024 | 45 | SADHANA CONSTRUCTION | 4.16 | 0.00 | 0 | 0 | |
6 | MALDAH | Malda Mechanical | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | W.B.S.E.D.C.LTD Quotation charge at TW No- I of Alal Zone-III, Gazole CCC in the dist of Malda Under Malda Mechanical Division PHE Dte. | BILL/03716/2023-2024 | BP-2023-24-711 | 18/03/2024 | W.B.S.E.D.C.LTD | 4.31 | 0.00 | 0 | null | ||||
7 | MALDAH | Malda Mechanical | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | W.B.S.E.D.C.LTD Quotation charge at TW No- I of Alal Zone-III, Gazole CCC in the dist of Malda Under Malda Mechanical Division PHE Dte. | BILL/03716/2023-2024 | BP-2023-24-711 | 18/03/2024 | W.B.S.E.D.C.LTD | 4.31 | 0.00 | 0 | null | ||||
8 | MALDAH | Malda Division | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | Construction of Boundary Wall at Head Work site of Alal Zone-III Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. | Mr. Arnab Giri, Assistant Engineer | Amit Karmakar, Junior Engineer | ORD/000267/2024-2025 | 3214/MD | 27/06/2024 | 30 | SAMBHU NATH SARKAR | 28.48 | 0.00 | 0 | 0 | |
9 | MALDAH | Malda Division | Augmentation of Alal Zone-III Piped Water Supply Scheme , SM/15951 | Augmentation | Formal work order for the work of Augmentation of ALAL ZONE- III Piped Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. | Mr. Arnab Giri, Assistant Engineer | Amit Karmakar, Junior Engineer | ORD/000096/2023-2024 | 2324/MD | 08/06/2023 | 270 | SAMBHU NATH SARKAR | 283.63 | 73.74 | 26 | 40 | |
Total | 375.96 | 76.68 | 20.4 |