Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 1,727.81 53.05 3.07  
1 MALDAH Malda Division Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation Material Requisition To Resource Division RTOR000069/2023-2024 1811/MD 27/04/2023 Resource Division 186.59 0.00 0 0
2 MALDAH Malda Mechanical Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation Supply, installation, commissioning of electro-mechanical components at T/W no. I, II,III &IV of Chanchal (zone-II) Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011884) Assistant Engineer - II ORD/000377/2023-2024 2385/MLMD 28/07/2023 90 GHOSH BROTHERS... 39.33 0.00 0 0
3 MALDAH Malda Division Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation Material Requisition To Resource Division RTOR000134/2023-2024 111/MD 05/01/2024 Resource Division 34.35 0.00 0 0
4 MALDAH Malda Division Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation Laying of Distribution Sysytem of Chanchal Zone -I, II & III Piped Water Supply Scheme at Chanchal -I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000926/2023-2024 535/MD 30/01/2024 45 GHOSH BROTHERS 56.98 0.00 0 0
5 MALDAH Malda Division Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation Formal work order for the work of Augmentation of CHANCHAL ZONE-I, ZONE-II AND ZONE-III Piped Water Supply Scheme at Chanchal-I Dev. Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000658/2022-2023 1026/MD 13/03/2023 270 GHOSH BROTHERS 1,318.20 34.88 2.65 10
6 MALDAH Malda Mechanical Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation New service connection at CHANCHAL PWSS Zone III T/W NO I Under EE/MLMD PHE DTE DIST. Malda.( CHANCHAL c c c) BILL/00236/2024-2025 BP-2024-25-85 16/04/2024 W.B.S.E.D.C.LTD 3.36 0.00 0 null
7 MALDAH Malda Mechanical Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II ,Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering and making compound lighting arrangement at T/W no. I of Chanchal (zone-I) Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011884) Assistant Engineer - II Junior Engineer-05 ORD/000627/2023-2024 2662/MLMD 10/08/2023 2005 HANNAN BUILDERS PVT. LTD. 35.18 10.47 29.76 60
8 MALDAH Malda Mechanical Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II, Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering and making compound lighting arrangement at T/W no. I of Chanchal (zone-III) Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011884) Assistant Engineer - II Junior Engineer-05 ORD/001704/2023-2024 3425/MLMD 01/11/2023 120 NABAUDYAG ELECTRICAL ENGINEERING CO-OPERATIV SOCIETY LTD. 33.92 7.70 22.7 65
9 MALDAH Malda Division Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 Augmentation Construction of Boundary Wall at Head Work site of Chanchal Zone-III Water Supply Scheme under Chanchal-I Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000447/2024-2025 4734/MD 11/09/2024 30 M/S MADHU CONSTRUCTION 19.90 0.00 0 0
Total 1,727.82 53.04 3.07