| Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 12 | 1,730.39 | 112.68 | 6.51 | ||||||||||||||
| 1 | MALDAH | Malda Division | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Material Requisition To Resource Division | RTOR000069/2023-2024 | 1811/MD | 27/04/2023 | 0 | Resource Division | 186.59 | 0.00 | 0 | 0 | |||
| 2 | MALDAH | Malda Mechanical | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II ,Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering and making compound lighting arrangement at T/W no. I of Chanchal (zone-I) Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011884) | Assistant Engineer - II | Junior Engineer-05 | ORD/000627/2023-2024 | 2662/MLMD | 10/08/2023 | 2005 | HANNAN BUILDERS PVT. LTD. | 35.18 | 20.93 | 59.49 | 60 | |
| 3 | MALDAH | Malda Mechanical | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II, Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering and making compound lighting arrangement at T/W no. I of Chanchal (zone-III) Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011884) | Assistant Engineer - II | Junior Engineer-05 | ORD/001704/2023-2024 | 3425/MLMD | 01/11/2023 | 818 | NABAUDYAG ELECTRICAL ENGINEERING CO-OPERATIV SOCIETY LTD. | 33.92 | 21.99 | 64.83 | 65 | |
| 4 | MALDAH | Malda Division | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Material Requisition To Resource Division | RTOR000134/2023-2024 | 111/MD | 05/01/2024 | 0 | Resource Division | 34.35 | 0.00 | 0 | 0 | |||
| 5 | MALDAH | Malda Mechanical | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | New service connection at CHANCHAL PWSS Zone III T/W NO I Under EE/MLMD PHE DTE DIST. Malda.( CHANCHAL c c c) | BILL/00236/2024-2025 | BP-2024-25-85 | 16/04/2024 | 0 | W.B.S.E.D.C.LTD | 3.36 | 0.00 | 0 | 0 | |||
| 6 | MALDAH | Malda Division | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Formal work order for the work of Augmentation of CHANCHAL ZONE-I, ZONE-II AND ZONE-III Piped Water Supply Scheme at Chanchal-I Dev. Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. | Mr. Sumit Kumar Ghosh, Assistant Engineer | Mr. Tilok Roy, Junior Engineer | ORD/000658/2022-2023 | 1026/MD | 13/03/2023 | 1111 | GHOSH BROTHERS | 1,318.20 | 69.76 | 5.29 | 15 | |
| 7 | MALDAH | Malda Mechanical | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Supply, installation, commissioning of electro-mechanical components at T/W no. I, II,III &IV of Chanchal (zone-II) Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011884) | Assistant Engineer - II | Junior Engineer-05 | ORD/000377/2023-2024 | 2385/MLMD | 28/07/2023 | 884 | GHOSH BROTHERS... | 39.33 | 0.00 | 0 | 0 | |
| 8 | MALDAH | Malda Division | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Laying of Distribution Sysytem of Chanchal Zone -I, II & III Piped Water Supply Scheme at Chanchal -I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. | Mr. Sumit Kumar Ghosh, Assistant Engineer | Mr. Tilok Roy, Junior Engineer | ORD/000926/2023-2024 | 535/MD | 30/01/2024 | 279 | GHOSH BROTHERS | 56.98 | 0.00 | 0 | 35 | |
| 9 | MALDAH | Malda Division | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Emergent Interconnection between Existing Tube Well and Bolck office building water tank in connection of CHANCHAL Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. | Mr. Sumit Kumar Ghosh, Assistant Engineer | Mr. Tilok Roy, Junior Engineer,Yusuf Sk, Junior Engineer | ORD/000763/2024-2025 | 6621/MD | 31/12/2024 | 180 | BIDYUT MAHALDAR | 0.86 | 0.00 | 0 | 100 | |
| 10 | MALDAH | Malda Division | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Construction of Boundary Wall at Head Work site of Chanchal Zone-III Water Supply Scheme under Chanchal-I Block under Malda Division, PHE Dte. in the district of Malda. | Mr. Sumit Kumar Ghosh, Assistant Engineer ,Sri Susanta Saha, Assistant Engineer | Mr. Tilok Roy, Junior Engineer,Yusuf Sk, Junior Engineer | ORD/000447/2024-2025 | 4734/MD | 11/09/2024 | 143 | M/S MADHU CONSTRUCTION | 19.90 | 0.00 | 0 | 0 | |
| 11 | MALDAH | Malda Division | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for Official use of the office of the Assistant Engineer, Chanchal Sub-Division Division, PHE Dte.(Car-2) (Period from 01/01/2025 to 30/06/2025). | Mr. Sumit Kumar Ghosh, Assistant Engineer ,Sri Susanta Saha, Assistant Engineer | Mr. Sanjit Sarkar, Junior Engineer ,Mr. Susanta Pal, JE_Deputation | ORD/000873/2024-2025 | 6636/MD | 31/12/2024 | 181 | M/S TEWARI CONSTRUCTION | 0.86 | 0.00 | 0 | 0 | |
| 12 | MALDAH | Malda Division | Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme , SM/13792 | Augmentation | Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for Official use of the office of the Assistant Engineer, Chanchal Sub-Division , PHE Dte.(Car-1) (Period from 01/01/2025 to 30/06/2025). | Mr. Sumit Kumar Ghosh, Assistant Engineer ,Sri Susanta Saha, Assistant Engineer | Mr. Sanjit Sarkar, Junior Engineer ,Mr. Susanta Pal, JE_Deputation | ORD/000872/2024-2025 | 6635/MD | 31/12/2024 | 181 | M/S FOUR STAR CONSTRUCTION | 0.86 | 0.00 | 0 | 0 | |
| Total | 1,730.39 | 112.69 | 6.51 | ||||||||||||||