Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 595.63 318.44 53.46  
1 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Material Requisition To Resource Division RTOR000040/2023-2024 1810/MD 27/04/2023 Resource Division 20.43 0.00 0 0
2 MALDAH Gazole Malda Mechanical BHADAR Piped Water Supply Scheme , SM/12768 New W.B.S.E.D.C.LTD Quotation charge at P/H No. I of Bhadar PWSS, Gazole C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000771/2023-2024 3004390642 16/08/2023 90 W.B.S.E.D.C.LTD 16.23 16.23 100 100
3 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Placing of diesel driven Car on hire basis for official use of the office of the Assistant Engineer, Malda Sadar Sub-Division, PHE Dte. under Malda Division, PHE Dte. in good running condition. (Period from 01/07/2023 to 30/09/2023). Mr. Arnab Giri, Assistant Engineer ORD/000596/2023-2024 487/MD 21/06/2023 90 SUBHANKAR SINGH 0.31 0.31 100 100
4 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Acceptance cum formal work order for Laying of Distribution of UPVC Pipeline of BHADAR Piped Water Supply Scheme at Gaole Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000105/2023-2024 2332/MD 08/06/2023 60 M/S KUNDU CONSTRUCTION 87.98 40.27 45.77 90
5 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Material Requisition To Resource Division RTOR000098/2023-2024 26/MD 04/01/2024 Resource Division 12.71 0.00 0 0
6 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Service Connection charge at P/H No. II of Bhadar Water Supply Scheme under Gazole C.C.C. in the district of Malda. BILL/00748/2023-2024 BP-2023-24-404 26/12/2023 WBSEDCL 11.36 0.00 0 0
7 MALDAH Gazole Malda Mechanical BHADAR Piped Water Supply Scheme , SM/12768 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II and making compound lighting arrangement at T/W no. I of Bhadar Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/014278) Assistant Engineer - II Junior Engineer-07 ORD/001662/2023-2024 3340/MLMD 30/10/2023 180 MOON LIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 25.45 11.87 46.64 93
8 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Construction of Boundary Wall at 2nd Tube Well Site of BHADAR Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000198/2024-2025 2930/MD 10/06/2024 45 NANDAN ENTERPRISE 6.73 0.00 0 0
9 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Construction of Boundary Wall at Head Work site of Bhadar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000885/2023-2024 269/MD 11/01/2024 45 MOONLIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 22.49 10.37 46.11 80
10 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Formal work order for the work of Implementation of BHADAR Piped Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000049/2023-2024 1996/MD 17/05/2023 270 MOONLIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 336.77 225.49 66.96 70
11 MALDAH Gazole Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Laying of Distribution Sysytem and Providing Functional Household Tap Connection (FHTC) of BHADAR Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000200/2024-2025 2928/MD 10/06/2024 45 MOONLIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 55.17 13.90 25.19 0
Total 595.63 318.45 53.46