Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 111.61 49.24 44.12  
1 MALDAH Harischandrapur - II Malda Division SAHAPUR Piped Water Supply Scheme , SM/12187 New Material Requisition To Resource Division RTOR000020/2023-2024 1616/MD 11/04/2023 Resource Division 2.45 0.00 0 0
2 MALDAH Harischandrapur - II Malda Division SAHAPUR Piped Water Supply Scheme , SM/12187 New Material Requisition To Resource Division RTOR000081/2023-2024 1811/MD 27/04/2023 Resource Division 1.20 0.00 0 0
3 MALDAH Harischandrapur - II Malda Division SAHAPUR Piped Water Supply Scheme , SM/12187 New Acceptance cum formal work order for Sinking of 250mm. Dia. x 150 mm. Big dia. and 135 Mtr. deep Tube Well Drilling by Direct Rotary method with 150 mm dia upvc strainer of 30m length all complete including cost of materials at Heads Work Site of SAHAPUR Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000375/2022-2023 780/MD 17/02/2023 30 SAUDAGAR (INDIA) 9.20 9.18 99.78 0
4 MALDAH Harischandrapur - II Malda Mechanical SAHAPUR Piped Water Supply Scheme , SM/12187 New W.B.S.E.D.C.LTD Quotation charge at P/H No. I of SAHAPUR ,Harishchandrapur C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000292/2023-2024 3004353830 17/07/2023 90 W.B.S.E.D.C.LTD 8.31 8.31 100 100
5 MALDAH Harischandrapur - II Malda Mechanical SAHAPUR Piped Water Supply Scheme , SM/12187 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I and making compound lighting arrangement at T/W no. I of Sahapur Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/013245) Assistant Engineer - II Junior Engineer-05 ORD/000329/2023-2024 2331/MLMD 26/07/2023 120 BEE GEE CONSTRUCTION. 13.37 2.49 18.62 62
6 MALDAH Harischandrapur - II Malda Division SAHAPUR Piped Water Supply Scheme , SM/12187 New Acceptance cum formal work order for Implementation of SAHAPUR Water Supply Scheme at Harishchandrapur-II Block of Malda district under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000490/2022-2023 594/MD 09/02/2023 90 M/S /FAIZUL HAQUE BISWAS 57.62 29.26 50.78 75
7 MALDAH Harischandrapur - II Malda Division SAHAPUR Piped Water Supply Scheme , SM/12187 New Construction of Boundary Wall at Head Work site of Sahapur Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000274/2024-2025 3201/MD 27/06/2024 30 ABANI BHUSAN GHOSH 17.12 0.00 0 0
8 MALDAH Harischandrapur - II Malda Division SAHAPUR Piped Water Supply Scheme , SM/12187 New Material Requisition To Resource Division RTOR000020/2024-2025 3996/MD 08/08/2024 Resource Division 2.34 0.00 0 0
Total 111.61 49.24 44.12