Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 139.15 36.54 26.26  
1 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DAKSHIN GOURIPUR Water Supply Scheme , SM/06858 Retrofitting Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DAKSHIN GOURIPUR Water Supply Scheme at Harshchandrapur-II Block under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000162/2020-2021 3046/MD 11/12/2020 30 S DUTTA 44.04 34.14 77.52 1
2 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DAKSHIN GOURIPUR Water Supply Scheme , SM/06858 Retrofitting Acceptance cum formal work order for Additional laying work of DI & UPVC pipe line of SADLICHAK W/S Scheme at HARISHCHANDRAPUR-II Dev. Block under Malda division.P.H.E.Dte. In the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000655/2021-2022 47/CSD 14/01/2022 30 BEE GEE CONSTRUCTION 4.19 0.00 0 1
3 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DAKSHIN GOURIPUR Water Supply Scheme , SM/06858 Retrofitting Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DHANJANA Water Supply Scheme at Chanchal-I Block under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Rajashree Banarjee, Junior Engineer ORD/000165/2020-2021 2718/MD 10/11/2020 30 NIRENDRA NATH KUNDU 58.72 0.33 0.56 1
4 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DAKSHIN GOURIPUR Water Supply Scheme , SM/06858 Retrofitting Acceptance cum formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of Mouza- Dakshin Gouripur, Village-Baghuya, JL No. 167 GP-Malior-II of DAKSHIN GOURIPUR Piped Water Supply Scheme at Harishchandrapur-II Dev. Block under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000382/2022-2023 2736/MD 18/11/2022 30 M/S SABANA CONSTRUCTION 3.28 2.07 63.11 100
5 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DAKSHIN GOURIPUR Water Supply Scheme , SM/06858 Retrofitting Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 100.00 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for BHAIRABPUR Water Supply Scheme at Harishchandrapur-II Dev. Block under Malda Division, PHE Dte. in the District of Malda. ORD/000222/2018-2019 801/MD 08/03/2019 MILLENNIUM ENTERPRISR 28.92 0.00 0 0
Total 139.16 36.54 26.26