Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 57.95 19.02 32.82  
1 UTTAR DINAJPUR Raiganj Division Replacement T/W for 4 Nos. water supply scheme. , SM/18227 Augmentation [PART-A]Sinking of Ground Bored Replacement Tube Wells by Direct Rotary Rig method using 300mm diameter x 200mm diameter,250 Mtr. deep Tube Well with 200mm dia UPVC Medium Well Screen (RMS) Pipes with Ribs Strainer 30 Mtr. long having 300mm dia, 45m long UPVC housing pipe, 200mm dia 175m long Well pipe along with 3mtr blank pipe all complete including cost of material with proper development and necessary yield for Islampur S.D.Hospital, Uttar Dinajpur under Raiganj Division, PHED. [PART-B] Laying of Rising Main pipeline including interconnection of Replacement Tubewells for Islampur S.D. Hospital at Islampur Block under Raiganj Division, P.H.E Dte.,Uttar Dinajpur Assistant Engineer ISD ORD/000443/2021-2022 2336/RD/PHE 16/12/2021 30 SAMIRAN PODDAR SPODDER.UDP@GMAIL.COM 14.45 12.15 84.08 0
2 UTTAR DINAJPUR Raiganj Division Replacement T/W for 4 Nos. water supply scheme. , SM/18227 Augmentation GROUND BORED BIG DIA TUBE WELL FOR KALIAGANJ MUNICIPAL ZONE-I WSS ORD/000307/2019-2020 156/RD 04/02/2020 2190 UNITED PROGRESSIVE ENGINEERS CO-OP &CONSTRUCTION SOCIETY LTD. 8.01 0.08 1 100
3 UTTAR DINAJPUR Raiganj Division Replacement T/W for 4 Nos. water supply scheme. , SM/18227 Augmentation GROUND BORED BIG DIA TUBE WELL FOR KUNOR WSS ORD/000304/2019-2020 157/RD 04/02/2020 2190 UNITED PROGRESSIVE ENGINEERS CO-OP &CONSTRUCTION SOCIETY LTD. 8.64 0.51 5.9 100
4 UTTAR DINAJPUR Raiganj Division Replacement T/W for 4 Nos. water supply scheme. , SM/18227 Augmentation SINKING GROUND BORED REPLACEMENT OF ISLAMPUR ZONE-II PWSS ORD/000471/2019-2020 155/RD 04/02/2020 90 SAMIRAN PODDAR 13.96 0.44 3.15 100
5 UTTAR DINAJPUR Raiganj Division Replacement T/W for 4 Nos. water supply scheme. , SM/18227 Augmentation Replacement of 250 x150mm dia. Tube-Well 250mtr. deep Rig bored Tube-Well for Pokheria PWSS at Itahar Block in the District of Uttar Dinajpur under Raiganj Division, PHE Dte. Assistant Engineer RSD Junior Engineer, RSD ORD/000443/2023-2024 199/RD/PHE 25/01/2024 20 UNITED PROGRESSIVE ENGINEERS CO-OP &CONSTRUCTION SOCIETY LTD. 12.89 5.84 45.31 100
Total 57.96 19.02 32.81