Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 7,321.81 106.53 1.45  
1 UTTAR DINAJPUR Chopra Raiganj Division DAKSHIN GORASAHID Piped Water Supply Scheme at Chopra block under Uttar Dinajpur District. , SM/12781 New Material Requisition To Resource Division RTOR000045/2023-2024 1329/RD/PHE 15/05/2023 0 Resource Division 20.34 0.00 0 0
2 UTTAR DINAJPUR Chopra Malda Mechanical DAKSHIN GORASAHID Piped Water Supply Scheme at Chopra block under Uttar Dinajpur District. , SM/12781 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II and making compound lighting arrangement at T/W no. I of Dakshin Gorasahid Water Supply Scheme in the District of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/014440) Assistant Engineer - I Junior Engineer-02 ORD/000488/2023-2024 2493/MLMD 04/08/2023 787 NABAUDYAG ELECTRICAL ENGINEERING CO-OPERATIV SOCIETY LTD. 28.34 21.02 74.17 74
3 UTTAR DINAJPUR Chopra Raiganj Division DAKSHIN GORASAHID Piped Water Supply Scheme at Chopra block under Uttar Dinajpur District. , SM/12781 New Sinking of Tube Well, laying of rising main & distribution system, providing FHTC ,construction of Over Head Reservoir over Pile / Raft Foundation including subsoil investigation, construction of Pump House, Chlorine room, Boundary Wall & Approach Road and allied works for 19 nos. Piped water supply Schemes within CHOPRA Dev. Block of Uttar Dinajpur District under Raiganj Division PHE Dte. Assistant Engineer ISD Junior Engineer, ISD ORD/000372/2023-2024 2567/RD/PHE 01/09/2023 805 ROY ENGINEERS. (PATNA) 7,213.93 85.51 1.19 30
4 UTTAR DINAJPUR Chopra Raiganj Division DAKSHIN GORASAHID Piped Water Supply Scheme at Chopra block under Uttar Dinajpur District. , SM/12781 New Laying of additional pipeline for improving FHTC with anciliary works at different mouzas at DAKSHIN GORASAHID PWSS Of CHOPRA Block under Islampur Sub-Division P.H.E. Dte. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000033/2025-2026 1213/RD/PHE 25/04/2025 45 SAMIRAN PODDAR SPODDER.UDP@GMAIL.COM 40.48 0.00 0 0
5 UTTAR DINAJPUR Chopra Raiganj Division DAKSHIN GORASAHID Piped Water Supply Scheme at Chopra block under Uttar Dinajpur District. , SM/12781 New Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per design norms of CPHEEO(latest) with necessary accessories for Dakhshin Gorasahid Water Supply Scheme at Chopra Block under Raiganj Division, P.H.E. Dte. Dist:- Uttar Dinajpur, Capacity- 40 M3/hr. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000392/2025-2026 1925/RD/PHE 30/06/2025 180 KOHINOOR ALAM 18.72 0.00 0 0
Total 7,321.81 106.53 1.45