Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 409.9 14.8 3.61  
1 JALPAIGURI Dhupguri Jalpaiguri Division PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Emergency repairing of existing pipelines at different locations damaged due to road development works including cleaning chokages of blocked pipelines for smooth running of drinking water under Paschim Salbari (zone-I) water supply scheme under Jalpaiguri Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000179/2022-2023 558/RWS 01/09/2022 30 SAHA CONSTRUCTION 3.50 0.00 0 1
2 JALPAIGURI Dhupguri Jalpaiguri Division PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Material Requisition To Resource Division RTOR000035/2023-2024 1114/JD 24/08/2023 0 Resource Division 9.67 0.00 0 0
3 JALPAIGURI Dhupguri Jalpaiguri Division PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Material Requisition To Resource Division RTOR000123/2023-2024 1837/JD 15/12/2023 0 Resource Division 5.41 0.00 0 0
4 JALPAIGURI Dhupguri Northern Mechanical PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for PASCHIM SALBARI PWSS, ZONE-I, TW NO I and II in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Driller-in-Charge Junior Engineer ORD/000350/2023-2024 1311/NMD 04/08/2023 30 DIAMOND ELECTRICAL WORKS 21.32 14.80 69.42 50
5 JALPAIGURI Dhupguri Northern Mechanical PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New New Service Connection Charge for PASCHIM SALBARI ZONE:- I, T/W-I, under DHUPGURI CCC APPLICATION NO. 4003417554 Reference ID : 403224815 BILL/00509/2024-2025 BP/24-25/111 05/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 9.90 0.00 0 0
6 JALPAIGURI Dhupguri Northern Mechanical PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New New Service Connection Charge for PASCHIM SALBARI ZONE:- I, T/W-II, under DHUPGURI CCC APPLICATION NO. 4003420142 Reference ID : 403226820 BILL/00511/2024-2025 BP/24-25/111 05/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.31 0.00 0 0
7 JALPAIGURI Dhupguri Jalpaiguri Division PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Balance Laying Distribution System and Providing Functional House Hold Tap Connection in connection with JJM at Paschim Salbari Zone-I Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000608/2024-2025 635/JD 28/03/2025 45 GOURAB GUHA ROY 22.72 0.00 0 0
8 JALPAIGURI Dhupguri Northern Mechanical PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Solarisation of WBSEDCL Energised Electrical Installation at different piped water supply schemes in connection with Jal Jeevan Mission in the Jalpaiguri District( Dhupguri Block) under Northern Mechanical Division, P.H.E. Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000001/2025-2026 960/NMD 03/04/2025 120 SILIGURI VYAPAR PRIVATE LIMITED 86.31 0.00 0 0
9 JALPAIGURI Dhupguri Northern Mechanical PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Installation of two tank chlorination system at different water supply scheme UNDER JJM under DHUPGURI Block under Northern Mechanical Division, P.H.E. Dte., Dist.- Jalpaiguri. Driller-in-Charge ORD/001137/2024-2025 53/DSD 10/03/2025 15 ASHWIRBAD WOOD CRAFT 2.47 0.00 0 0
10 JALPAIGURI Dhupguri Northern Mechanical PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Yard lighting arrangement at Head Work Site for Different PWSS under JJM in the BLOCK: DHUPGURI, DISTRICT: JALPAIGURI under Northern Mechanical Division, P.H.E. Dte. Driller-in-Charge Junior Engineer ORD/001049/2024-2025 31/NMD 06/01/2025 30 ANIMA ENTERPRISE 15.32 0.00 0 0
11 JALPAIGURI Dhupguri Jalpaiguri Division PASCHIM SALBARI ZONE-I PIPED WATER SUPPLY SCHEME , SM/15915 New Construction of different balance component of PASCHIM SALBARI ZONE-I PWSS i.e. Pump Houses, water distribution Network, OHR, Rising Main, FHTC etc.in connection with Jal Jeevan Mission at Block Dhupguri under Jalpaiguri Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000240/2025-2026 2346/JD 04/11/2025 120 MD HAKIMUDDIN 227.97 0.00 0 0
Total 409.89 14.80 3.61