Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
21 164.24 79.13 48.18  
1 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Sinking of 2 No. 250 mm x 150 mm x 132 m deep Rig Bored Tube Well by Reverse Rotary method of drilling for Rejuvenation of Basilardanga Piped Water Supply Scheme under Jalpaiguri Division P.H.E. Dte. Junior Engineer ORD/000731/2021-2022 642/JD 08/03/2022 30 MECHANO TRADING CO. 15.51 0.00 0 1
2 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Infrastructure cost for New Service Connection Charge for TW-III of BASILARDANGA W/S Scheme under MAYNAGURI CCC [APPLICATION NO. 100000053960 ; Reference ID : 860243610] VCH/000338/2022-2023 RTGS 01 07/07/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.06 0.00 0 0
3 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation New Service Connection Charge for TW-IV of BASILARDANGA W/S Scheme under MAYNAGURI CCC [APPLICATION NO. 4002941268 ; Reference ID : 402831980] VCH/000339/2022-2023 RTGS 01 07/07/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.68 0.00 0 0
4 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation New Service Connection Charge for TW-III of BASILARDANGA W/S Scheme under MAYNAGURI CCC [APPLICATION NO. 4002941265 ; Reference ID : 402831972] VCH/000337/2022-2023 RTGS 01 07/07/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.68 0.00 0 0
5 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Infrastructure cost for New Service Connection Charge for TW-IV of BASILARDANGA W/S Scheme under MAYNAGURI CCC [APPLICATION NO. 100000053938 ; Reference ID : 860243608] VCH/000340/2022-2023 RTGS 01 07/07/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.92 0.00 0 0
6 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Infrastructure cost for New Service Connection Charge for TW-III, of BASILARDANGA W/S Scheme under MAYNAGURI CCC [APPLICATION NO. 100000057050 , Reference ID : 860246650] VCH/000774/2022-2023 BP/2022-23/30 16/08/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.57 0.00 0 0
7 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Supply, delivery & installation of 10KVA Servo Motor operated Copper wound line voltage corrector under Rejuvenation of Basilardanga Piped W/S Scheme at T/W No. III in the district of Jalpaiguri under Northern Mechanical Division, P.H. Engineering Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000103/2022-2023 570/NMD 14/07/2022 21 GURUKRIPA ENTERPRISE 1.87 1.87 100 0
8 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Supply, delivery & installation of 10KVA Servo Motor operated Copper wound line voltage corrector under Rejuvenation of Basilardanga Piped W/S Scheme at T/W No. IV in the district of Jalpaiguri under Northern Mechanical Division, P.H. Engineering Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000104/2022-2023 571/NMD 14/07/2022 21 HARAGOURI ENTERPRISE 1.87 1.87 100 0
9 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation SINKING OF TUBE WELL FOR BASILARDANGA PWSS VCH/000313/2022-2023 BP-2022-23-95 02/08/2022 MECHANO TRADING CO. 12.87 0.00 0 0
10 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Construction of Pump House (3.60 m x 2.40 m) internal size with sanitary & plumbing arrangement including Construction of boundary wall with gate,drain and pathway for 4th Tube well site of Rejuvenation of Basilardanga Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. Junior Engineer ORD/000473/2021-2022 2219/JD 27/12/2021 60 PARESH CHANDRA ROY 11.45 11.44 99.91 1
11 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components for BASILARDANGA PWSS, at TW no III in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000113/2022-2023 850/NMD 18/07/2022 30 S.P. ENTERPRISE 7.74 7.74 100 0
12 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Interconnection with Delivery Line of Tube Well ( 3rd and 4th ) to Distribution Pipeline & Backwash line at Basilardanga Water Supply Scheme under Jalpaiguri Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000274/2022-2023 2011/JD 01/11/2022 15 SANKAR DAS 6.64 4.90 73.8 1
13 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Construction of Pump House (3.60 m x 2.40 m) internal size with sanitary & plumbing arrangement including Construction of boundary wall with gate,drain and pathway for 3rd Tube well site of Rejuvenation of Basilardanga Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. Junior Engineer ORD/000485/2021-2022 2218/JD 27/12/2021 60 M/S DEY & ROY CHOUDHURY 11.44 11.43 99.91 1
14 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components for BASILARDANGA PWSS, at TW no IV in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000114/2022-2023 851/NMD 18/07/2022 30 M/S ANJALI ENTERPRISE 7.60 7.60 100 0
15 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Retrofitting works & other ancillary works related to FHTC at different places of Basilardanga PWSS under Jalpaiguri Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000383/2022-2023 368/JD 20/02/2023 15 DIPAK KUMAR CHAKRABORTY 1.81 1.81 100 0
16 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Reparing on OHR , pump house , IEP Room , boundary wall , construction of pathway , & other ancillary works for Basilardanga piped W/S/S under Jalpaiguri Division , P.H.E. Dte ORD/000588/2021-2022 178/RWS 03/03/2022 30 PARESH CHANDRA GUHA 4.85 4.02 82.89 0
17 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Installation of Iron Elimination Plant including construction of Blower Room (3.60MX3.00M ) Size, concrete platform & drain etc. at 3rd tube well site of Rejuvenation of Basilardanga water supply scheme under Jalpaiguri Division PHE Dte. Assistant Engineer Junior Engineer ORD/000140/2022-2023 1603/JD 18/08/2022 45 SANDIP BANIK 13.65 12.43 91.06 0
18 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Installation of Iron Elimination Plant including construction of Blower Room (3.60MX3.00M ) Size, concrete platform & drain ...etc at 4th tube well site of Rejuvenation of Basilardanga water supply scheme under Jalpaiguri Division PHE Dte. Assistant Engineer Junior Engineer ORD/000294/2022-2023 2067/JD 04/11/2022 45 R.S CONSTRUCTION 13.65 13.60 99.63 100
19 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Hiring of Maxi Cab vehicle (Non-Airconditioned) for the Implementation of JJM Works at different district under NMD,PHE,Dte Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000725/2023-2024 146/HQ/NMD 31/07/2023 90 UTTAM PAUL 0.95 0.00 0 0
20 JALPAIGURI Jalpaiguri Division Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Providing FHTC and Retrofitting works in connection with FHTC works under JJM at Binnaguri colony, Nirendarpur, Tekatuli of Basilardanga W/S/S under Jalpaiguri Division, P.H.E.Dte. Block-Maynaguri, District - Jalpaiguri.(Part-D) Junior Engineer ORD/000432/2022-2023 631/JD 13/03/2023 45 PARESH CHANDRA GUHA 40.48 0.00 0 100
21 JALPAIGURI Northern Mechanical Rejuvenation of Basilardanga piped water supply scheme. , SM/09460 Augmentation Hiring of Maxi Cab vehicle (Non-Airconditioned) for the Implementation of JJM Works at different district under NMD,PHE,Dte Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000042/2023-2024 21/HQ/NMD 20/04/2023 90 UTTAM PAUL 0.95 0.42 44.21 100
Total 164.24 79.13 48.18