Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 21,900.75 265.99 1.21  
1 DARJEELING Phansidewa Siliguri W/S Division Mandila Jhar Piped Water Supply Scheme. , SM/18784 New Material Requisition To Resource Division RTOR000023/2023-2024 1807/SWSD 30/09/2023 0 Resource Division 18.81 0.00 0 0
2 DARJEELING Phansidewa Northern Mechanical Mandila Jhar Piped Water Supply Scheme. , SM/18784 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for MANDILA JHAR PIPED WATER SUPPLY SCHEME, TW No. I and II in the district of Darjeeling under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000938/2023-2024 1671/NMD 29/09/2023 460 SAIKAT SINHA 11.58 7.89 68.13 100
3 DARJEELING Phansidewa Siliguri W/S Division Mandila Jhar Piped Water Supply Scheme. , SM/18784 New Material Requisition To Resource Division RTOR000051/2023-2024 76/SWSD 10/01/2024 0 Resource Division 9.49 0.00 0 0
4 DARJEELING Phansidewa Northern Mechanical Mandila Jhar Piped Water Supply Scheme. , SM/18784 New Infrastructure Cost for MANDILA JHAR T/W No. II, under BIDHANNAGAR CCC , [APPLICATION NO. 4003322508, Reference ID : 403149170] BILL/02044/2023-2024 BP/23-24/311 21/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.46 0.00 0 0
5 DARJEELING Phansidewa Northern Mechanical Mandila Jhar Piped Water Supply Scheme. , SM/18784 New Infrastructure Cost for MANDILA JHAR T/W No. I, under BIDHANNAGAR CCC , [APPLICATION NO. 4003322513, Reference ID : 403149165] BILL/02043/2023-2024 BP/23-24/311 21/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 6.51 0.00 0 0
6 DARJEELING Phansidewa Central Drilling Mandila Jhar Piped Water Supply Scheme. , SM/18784 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 11.96 0.06 11
7 DARJEELING Phansidewa Siliguri W/S Division Mandila Jhar Piped Water Supply Scheme. , SM/18784 New Work Order for Construction of 250 cu.m. capacity R.C.C. Elevated Reservoir , 20 Mtrs. Staging height at the head work site including distribution system (HDPE) with rising main, Rig bore 2 nos. big dia T/W by Odex-165 method, providing functional household tap connection (FHTC), pump house 2 nos., blower room, IEP 60 cu.m./hr., boundary walls, soil testing and allied works at Mandilajhar PWSS Phansidewa block under Siliguri Sub Division, P.H.E. Dte. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000183/2023-2024 1812/SWSD 03/10/2023 393 KRISHNA TRADING CO. 509.14 246.14 48.34 60
Total 21,900.76 265.99 1.21