Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 326.63 2.56 0.78  
1 DARJEELING Kharibari Siliguri W/S Division Sona Chandi Piped Water Supply Scheme , SM/13436 New Material Requisition To Resource Division RTOR000060/2022-2023 2040/SWSD 16/12/2022 0 Resource Division 16.12 0.00 0 0
2 DARJEELING Kharibari Siliguri W/S Division Sona Chandi Piped Water Supply Scheme , SM/13436 New PREPARATION OF DETAILS PROJECT REPORT (DPR) INCLUDING ROUTE SURVEY IN CONNECTION WITH AUGMENTATION OF SONA CHANDI PIPED WATER SUPPLY SCHEME UNDER KHARIBARI BLOCK, SILIGURI SUB DIVISION, P.H.E. DTE Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000064/2023-2024 257/SSD 05/06/2023 10 SUBHANKAR GHOSH 2.56 2.56 100 100
3 DARJEELING Kharibari Siliguri W/S Division Sona Chandi Piped Water Supply Scheme , SM/13436 New Material Requisition To Resource Division RTOR000044/2023-2024 69/SWSD 10/01/2024 0 Resource Division 2.56 0.00 0 0
4 DARJEELING Kharibari Northern Mechanical Sona Chandi Piped Water Supply Scheme , SM/13436 New New Service Connection Charge for SONA CHANDI, T/W No. II, under KHARIBARI CCC, [APPLICATION NO. 4003319753, Reference ID : 403147078] BILL/01951/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 9.20 0.00 0 0
5 DARJEELING Kharibari Northern Mechanical Sona Chandi Piped Water Supply Scheme , SM/13436 New New Service Connection Charge for SONA CHANDI, T/W No. I, under KHARIBARI CCC, [APPLICATION NO. 4003319880, Reference ID : 403147076] BILL/01950/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.90 0.00 0 0
6 DARJEELING Kharibari Siliguri W/S Division Sona Chandi Piped Water Supply Scheme , SM/13436 New Construction of Pump House 2 nos, Rig bord 2 nos big dia T/W by Odex -165 method, Boundary walls, Laying distribution system (HDPE pipe), rising main, Providing FHTC & Supplying Fabrication on suitable RCC foundation & commissioning with (Three) month trial run IEP (25 cum/hr) and allied works for Augmentation of Sona Chandi PWSS at Kharibari block under Siliguri Sub Division, PHE Dte. Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000001/2023-2024 09/SWSD 05/04/2023 105 A.K.CONSTRUCTION 115.86 0.00 0 60
7 DARJEELING Kharibari Northern Mechanical Sona Chandi Piped Water Supply Scheme , SM/13436 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Sona Chandi Piped Water Supply Scheme, TW No I and II in the district of Darjeeling under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000662/2023-2024 1476/NMD 17/08/2023 776 T S CONSTRUCTION 24.83 0.00 0 90
8 DARJEELING Kharibari Northern Mechanical Sona Chandi Piped Water Supply Scheme , SM/13436 New Yard lighting arrangement at Head Work Site for Different PWSS under JJM in the BLOCK: KHARIBARI, DISTRICT: DARJEELING under Northern Mechanical Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001069/2024-2025 37/NMD 06/01/2025 30 S.P. ENTERPRISE 12.18 0.00 0 0
9 DARJEELING Kharibari Northern Mechanical Sona Chandi Piped Water Supply Scheme , SM/13436 New Solarisation of WBSEDCL Energised Electrical Installation at different piped water supply schemes in connection with Jal Jeevan Mission in the Darjeeling District (KHARIBARI Block) under Northern Mechanical Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000997/2024-2025 16/NMD 06/01/2025 120 SILIGURI VYAPAR PRIVATE LIMITED 41.15 0.00 0 0
10 DARJEELING Kharibari Northern Mechanical Sona Chandi Piped Water Supply Scheme , SM/13436 New Implementation of Affordable IoT-Enabled Water Service Delivery Measurement and Monitoring Sensing System for Rural Deployment in the Proposed Villages under Different Water Supply Schemes at Different Block of Darjeeling District in West Bengal. Assistant Engineer Junior Engineer ORD/000092/2025-2026 1114/NMD 19/05/2025 180 WEBEL TECHNOLOGY LIMITED 96.27 0.00 0 0
Total 326.63 2.56 0.78