Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 861.19 348.34 40.45  
1 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Preparation of Details Project Report (D.P.R.) in connection with the augmentation of Bairatisal W/S Scheme at Matigara block of Siliguri Sub Division under Siliguri W/S Division, PHE Dte. in connection with Jal Jeevan Mission and Jal Swapno Programme. SL. NO. 06. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000113/2021-2022 833/SWSD 13/08/2021 25 ENVIROTECH SOLUTIONS 4.85 4.85 100 100
2 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Procurement of material from Resource Division P.H.E Dte. for the works of different water supply scheme. VCH/000893/2021-2022 BP-2021-22-111 25/03/2022 0 EXECUTIVE ENGINEER,RESOURCES DIVISION,PHE DTE. 38.20 0.00 0 0
3 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Procurement of material from Resource Division P.H.E Dte. for the works of different water supply scheme. VCH/000296/2022-2023 08/08/2022 0 EXECUTIVE ENGINEER,RESOURCES DIVISION,PHE DTE. 9.30 0.00 0 0
4 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Sinking of 02(Two) Nos Rig Bore Big Dia Deep Tubewell by ODEX-165 method of drilling at different TW Sites as mentioned in ANNEXURE-A under different Piped Water Supply Scheme under Siliguri Sub Division, PHE Dte. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000168/2022-2023 1328/SWSD 14/09/2022 25 RANJEET SINGH BENIWAL 15.46 5.55 35.9 88
5 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Sinking of 02(Two) Nos Rig Bore Big Dia Deep Tubewell by ODEX-165 method of drilling at different TW Sites as mentioned in ANNEXURE-A under different Piped Water Supply Scheme under Siliguri Sub Division, PHE Dte. Assistant Engineer(Civil) ORD/000170/2022-2023 1330/SWSD 14/09/2022 25 M/S K. R. S. CONSTRUCTION 15.45 0.00 0 0
6 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Material Requisition To Resource Division RTOR000023/2022-2023 1453/SWSD 29/09/2022 0 Resource Division 27.72 0.00 0 0
7 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Material Requisition To Resource Division RTOR000003/2022-2023 130/SWSD 13/04/2022 0 Resource Division 14.63 0.00 0 0
8 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Material Requisition To Resource Division RTOR000015/2021-2022 2173/SWSD 11/02/2022 0 Resource Division 34.95 0.00 0 0
9 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Hiring 1 (one) no. Maxi Cab with engine capacity less than or equal to 2000 CC (WITH AIR CONDITION ) fore office of the Executive Engineer, Siliguri W/S division PHE Dte. for the period from 01.09.2021 to 28.02.2022 BILL/00051/2022-2023 BP-2022-23-119 20/02/2023 0 SUBIR CH. CHOWDHURY 1.50 0.00 0 0
10 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Resources payment for Different Water Supply Scheme BILL/00121/2022-2023 BP-2022-23-141 13/03/2023 0 EXECUTIVE ENGINEER,RESOURCES DIVISION,PHE DTE. 131.28 0.00 0 0
11 DARJEELING Northern Mechanical AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation New Service Connection Charge for AUG BAIRATISAL,T/W No. II,ZONE-II under SHIVMANDIR CCC [APPLICATION NO. 4003312875 , Reference ID : 403140527] BILL/01917/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 10.31 0.00 0 0
12 DARJEELING Northern Mechanical AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation New Service Connection Charge for AUG OF BAIRATISAL, T/W No. I, ZONE-II, under SHEVMANDIR CCC [APPLICATION NO. 4003312877 , Reference ID : 403140528] BILL/01916/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 9.29 0.00 0 0
13 DARJEELING Siliguri W/S Division AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Construction of 550 cu.m. capacity R.C.C. Elevated Reservoir, 20 mtrs. Staging height at the head works site, laying Rising Main, laying distribution pipeline with Functional household tap connection (FHTC), construction of 2 (two) nos. Pump House (5.40 X 3.60 m), Iron elimination plant (IEP) with blower room, sinking of 2 (two) nos tube well (ODEX-165 method) and boundary wall for BAIRATISAL PWSS (Zone-II), Block Matigara Dist. Darjeeling under Siliguri W/S Division, PHE Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000118/2023-2024 1204/SWSD 11/08/2023 767 BRM DEVELOPERS 527.89 324.64 61.5 20
14 DARJEELING Northern Mechanical AUGMENTATION OF BAIRATISAL ZONE - II PIPED WATER SUPPLY SCHEME , SM/10108 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF BAIRATISAL ZONE - II (TW No. I and II) PIPED WATER SUPPLY SCHEME, in the district of Darjeeling under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000797/2022-2023 111/NMD 03/02/2023 910 CHOWDHURY AND BASU ENTERPRISE 20.36 13.30 65.32 100
Total 861.19 348.35 40.45