No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
3 2,734.58
1 Barasat Arsenic Division ORD/000062/2024-2025 30/10/2024 1754/B.Ar.D OM ENTERPRISE Hiring of one (1) no. Diesel / Petrol operated motor cab (Car No. WB 07J 1216) with driver for official use of Assistant Engineer, Sub - Division under B.Ar.D, PHE Dte. for different works under JJM Schemes with all costs towards the owner except fuel cos 0.86
2 Barasat Arsenic Division ORD/000067/2024-2025 22/11/2024 0/B.Ar.D. S & P ENTERPRISE Laying, fitting, fixing, jointing etc of different dia pipe line and other allied works of Swarupnagar Block under Integrated Surface Water Base Piped W/S Scheme for Arsenic affected blocks of Baduria, Basirhat-I & II, Swarupnagar and Deganga in the dist 1,339.71
3 Barasat Arsenic Division ORD/000068/2024-2025 22/11/2024 0/B.Ar.D. AMAL DUTTA ROY Balance laying of pipeline and other allied works under Basirhat-I Block for the project of Integrated Surface Water Base Piped W/S Scheme for Arsenic affected blocks of Baduria, Basirhat-I & II, Swarupnagar and Deganga in the district of North 24 Pargana 1,394.01
Total 2,734.58