No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
5 150.65
1 Siliguri W/S Division ORD/000127/2021-2022 08/03/2022 2366/SWSD M/S DEBRAJ ENTERPRISE Supplying, fabrication, erection on suitable RCC foundation and commissioning with 3 (three) months trial run of pressure type Iron Removal Plant with blower cum compressor room of internal size (3.6 M X 3.00 M) and platform of size (9.00 m X 4.50 m) for 13.19
2 Siliguri W/S Division ORD/000006/2022-2023 18/04/2022 146/SWSD PROSANTA KUMAR DAS Construction of 200 cu.m. capacity R.C.C. Elevated Reservoir, 20 Mtrs. Staging Height at the head works site including Rising Mains and Distribution System (Part-A) allied with Providing Functional Household Tap Connection (FHTC) under Jal Swapno and Jal 130.22
3 Siliguri W/S Division ORD/000018/2023-2024 04/05/2023 195/SSD M/S UTPAL CHAKRABORTY & CO. Construction of Pumphouse (3.6*3.0m), at Champta site under Augmentation of Champta piped water supply scheme under Matigara Block Darjeeling District in connection with Jal jeeven Mission under Siliguri Sub-Division,P.H.E Dte. 4.75
4 Siliguri W/S Division ORD/000112/2021-2022 13/08/2021 832/SWSD SUBHANKAR GHOSH Preparation of Details Project Report (D.P.R.) in connection with the augmentation of Salbari W/S Scheme at Matigara block of Siliguri Sub Division under Siliguri W/S Division, PHE Dte. in connection with Jal Jeevan Mission and Jal Swapno Programme. SL. 1.61
5 Siliguri W/S Division ORD/000400/2023-2024 30/01/2024 225/SWSD BUDDHADEV NAG Continuation order of Hiring of I (one) nos Diesel Motor CAB on monthly basis for the Assistant Engineer II ,Office of Executive Engineer under Siligui W/S Division, P.H.E Dte..for the month of 01/02/2024 to 31/07/2024 0.88
Total 150.65