Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
9 3,134.67
1 Birbhum Division ORD/000365/2022-2023 14/12/2022 2773/BHM MANASH GHOSH Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of Panchra under Panchra Water Supply Water Supply Scheme within Birbhum Division, PHE Dte. (Sl. No.9) 93.92
2 Birbhum Division ORD/000099/2024-2025 26/07/2024 63521/BHM BANI ENGINEERING CO. "Construction of 200CuM. capacity O.H.R. with Soil Investigation,5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements.laying of Rising Main,Distribution System with FHTC and different works related to FEUGRAM PIPED WATER SUPPLY SCHEME (TS 483.16
3 Birbhum Division ORD/000706/2023-2024 01/03/2024 765/BHM SOURAV MONDAL REPAIR OF STAFF QUARTER NO C-2 WITHIN THE CAMPUS OF BIRBHUM DIVISION OFFICE, P.H.E DTE,SURI,BIRBHUM. 0.94
4 Birbhum Division ORD/000708/2023-2024 01/03/2024 767/BHM MANASH GHOSH Construction of SLUICE VALVE CHAMBER (80 mm to 150 mm dia) at Village FULGARIA & DHANUKDANGA under MALDANGA Water Supply Scheme under Birbhum Division, PHE.Dte. 0.98
5 Birbhum Division ORD/000097/2024-2025 26/07/2024 6312/BHM PULAK KUMAR PAL Construction of 5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements, 200 CuM OHR, Boundary wall, Soil Investigation, Land development, Rising main, Laying distribution, road restoration and Providing functional household tap connection re 409.54
6 Birbhum Division ORD/000098/2024-2025 26/07/2024 6524132/BHM ASIM KUMAR MONDAL Construction of 5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements, 200 CuM OHR, Boundary wall, Soil Investigation, Land development, Rising main, Laying distribution, road restoration and Providing functional household tap connection re 400.06
7 Birbhum Division ORD/000093/2024-2025 22/07/2024 2163/BHM NIBHAS SINHA "Construction of 200CuM. capacity O.H.R. with Soil Investigation,5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements Laying of Rising Main ,Distribution Systemwith FHTC including different works related to MADDA PIPED WATER SUPPLY SCHEME 434.39
8 Birbhum Division ORD/000094/2024-2025 23/07/2024 65412/BHM KINGS & CO. Sinking of 250 mm. X 200 mm Dia deep tubewell , Construction of 350 CuM,300 CuM capacity O.H.R.with soil Investigation, 250 CuM capacity CWR, Pump room/ Chlorine room with/without sanitary arrangements( different size),and laying of Rising main,Distribut 685.99
9 Birbhum Division ORD/000095/2024-2025 23/07/2024 4152/BHM EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Laying distribution system with FHTC for proposed augmentation scheme for Illambazar Piped Water Supply Scheme, Illambazar Block, under Birbhum Division, PHE Dte 625.69
Total 3,134.67