9 | 3,134.67 | ||||||
1 | Birbhum Division | ORD/000365/2022-2023 | 14/12/2022 | 2773/BHM | MANASH GHOSH | Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of Panchra under Panchra Water Supply Water Supply Scheme within Birbhum Division, PHE Dte. (Sl. No.9) | 93.92 |
2 | Birbhum Division | ORD/000099/2024-2025 | 26/07/2024 | 63521/BHM | BANI ENGINEERING CO. | "Construction of 200CuM. capacity O.H.R. with Soil Investigation,5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements.laying of Rising Main,Distribution System with FHTC and different works related to FEUGRAM PIPED WATER SUPPLY SCHEME (TS | 483.16 |
3 | Birbhum Division | ORD/000706/2023-2024 | 01/03/2024 | 765/BHM | SOURAV MONDAL | REPAIR OF STAFF QUARTER NO C-2 WITHIN THE CAMPUS OF BIRBHUM DIVISION OFFICE, P.H.E DTE,SURI,BIRBHUM. | 0.94 |
4 | Birbhum Division | ORD/000708/2023-2024 | 01/03/2024 | 767/BHM | MANASH GHOSH | Construction of SLUICE VALVE CHAMBER (80 mm to 150 mm dia) at Village FULGARIA & DHANUKDANGA under MALDANGA Water Supply Scheme under Birbhum Division, PHE.Dte. | 0.98 |
5 | Birbhum Division | ORD/000097/2024-2025 | 26/07/2024 | 6312/BHM | PULAK KUMAR PAL | Construction of 5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements, 200 CuM OHR, Boundary wall, Soil Investigation, Land development, Rising main, Laying distribution, road restoration and Providing functional household tap connection re | 409.54 |
6 | Birbhum Division | ORD/000098/2024-2025 | 26/07/2024 | 6524132/BHM | ASIM KUMAR MONDAL | Construction of 5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements, 200 CuM OHR, Boundary wall, Soil Investigation, Land development, Rising main, Laying distribution, road restoration and Providing functional household tap connection re | 400.06 |
7 | Birbhum Division | ORD/000093/2024-2025 | 22/07/2024 | 2163/BHM | NIBHAS SINHA | "Construction of 200CuM. capacity O.H.R. with Soil Investigation,5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements Laying of Rising Main ,Distribution Systemwith FHTC including different works related to MADDA PIPED WATER SUPPLY SCHEME | 434.39 |
8 | Birbhum Division | ORD/000094/2024-2025 | 23/07/2024 | 65412/BHM | KINGS & CO. | Sinking of 250 mm. X 200 mm Dia deep tubewell , Construction of 350 CuM,300 CuM capacity O.H.R.with soil Investigation, 250 CuM capacity CWR, Pump room/ Chlorine room with/without sanitary arrangements( different size),and laying of Rising main,Distribut | 685.99 |
9 | Birbhum Division | ORD/000095/2024-2025 | 23/07/2024 | 4152/BHM | EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD | Laying distribution system with FHTC for proposed augmentation scheme for Illambazar Piped Water Supply Scheme, Illambazar Block, under Birbhum Division, PHE Dte | 625.69 |
Total | 3,134.67 |