Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
6 | 143.22 | ||||||
1 | Barasat Division | ORD/000454/2024-2025 | 13/09/2024 | KuruliaZI/GhoshCons | GHOSH CONSTRUCTION. | Acceptance cum work order for Repairing and renovation works for 225 cum. capacity 20 mtr. staging height R.C.C. Over Head water Reservoir for Augmentation of Kurulia (Zone-I) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Divis | 13.22 |
2 | Barasat Division | ORD/000434/2024-2025 | 11/09/2024 | Kapil/Roham | ROHAN ENTERPRISE. | Acceptance cum work order for Laying of UPVC Distribution pipe line and providing FHTC for augmentation of Kapileswarpur water Supply Scheme within Swarupnagar Block under Basirhat Sub Division PHE Dte. | 6.13 |
3 | Barasat Division | ORD/000642/2024-2025 | 12/11/2024 | Atin | ATINDRA CONSTRUCTION PRIVATE LIMITED | Formal work order for MS Pipeline Crossing by adopting Mini HDD for Road Crossing at Belta Chowmath on Palla-Chandpara Road including the cost of carrier pipe, all labours, materials tools and cleaning of site etc. complete in all respect for Surface Wate | 115.76 |
4 | Barasat Division | ORD/000438/2024-2025 | 11/09/2024 | Sonepur/prema | PREMANANDA ROY BISWAS. | Acceptance cum work order for Laying of UPVC Distribution pipe line and providing FHTC for augmentation of Sonepur water Supply Scheme within Swarupnagar Block under Basirhat Sub Division PHE Dte. | 4.64 |
5 | Barasat Division | ORD/000467/2024-2025 | 24/05/2024 | 942/BHTSD | N.R. ENTERPRISE | Dismantling of a dilapidated Room due to construction of Bio Eco Tech Plant at the Head Work site of Dakshin Chatra Zone I Water Supply Scheme under Barasat Division, P.H.E. | 0.97 |
6 | Barasat Division | ORD/000469/2024-2025 | 10/09/2024 | 584/BSD | MANGES INDUSTRIAL CORPORATION. | Repair and Renovation Work of Pump House at 3rd Tubewell site and allied works at Nebadhui Duttapukur Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. | 2.51 |
Total | 143.22 |