No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
22 1,397.15
1 Alipore Division ORD/000341/2024-2025 15/07/2024 2753/AD M/S. S.S. ENTERPRISE Allied works for pile and pile cap portion regarding the construction of 1 no. 150 cum. capacity 20 mtr. staging height R.C.C. Over Head Reservoir as per departmental design, drawing and specification including R.C.C. Bored pile and pile cap upto pedesta 339.97
2 Alipore Division ORD/000390/2024-2025 25/07/2024 3058/AD SWASTIK CONSTRUCTION Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 4th Tubewell Site of Dakshin Durgapur W/S scheme, Block : Namkhan under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (SM/18 9.59
3 Alipore Division ORD/000363/2024-2025 10/07/2024 2912/AD AVIK ENTERPRISE Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections etc at Baliara PWSS, Block-Namkhana for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (Part-A) (SM/18392) 115.68
4 Alipore Division ORD/000393/2024-2025 18/07/2024 2998/AD M/S P. B. CONSTRUCTION Continuation for the work of Fund for 04 months (September to December) for sample collection charges where facilitators are unavailable / inactive related to Water Quality Monitoring and surveillance under JJM for Sonapur Block under South 24 Parganas 3.15
5 Alipore Division ORD/000200/2024-2025 19/06/2024 2583/AD M/S KHAJABABA ENTERPRISE Laying distribution system for providing FHTC and Construction of Platform to all households for Augmentation of Kakdwip Akshaynagar Zone-II W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. 10.04
6 Alipore Division ORD/000374/2024-2025 01/07/2024 2793/AD M/S P. B. CONSTRUCTION Continuation work order for the work of Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Executive Engineer, Alipore Division, PHE Dte. for the period from 01.07.2024 to 31.12.2024 2.40
7 Alipore Division ORD/000385/2024-2025 25/07/2024 3081/AD M/S B.S. ENTERPRISE Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at 4th Tubewell Site for Augmentation of Bishnupur (Zone - I and II) W/S scheme, Block : Sagar under JJM of Kakdwip Sub-Division under Alipore 11.75
8 Alipore Division ORD/000386/2024-2025 25/07/2024 3082/AD M/S KHAJABABA ENTERPRISE Construction of 1 no. Pump House of size 5.40 mtr. x 3.60 mtr. at 3rd Tubewell site for Naraharipur Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (SM/18876) 7.18
9 Alipore Division ORD/000391/2024-2025 25/07/2024 3059/AD SK SAKIL AHAMED Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 2nd Tubewell Site of Dakshin Chandranagar W/S scheme, Block : Namkhana under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. ( 9.60
10 Alipore Division ORD/000195/2024-2025 19/06/2024 2578/AD M/S R.K.ENTERPRISE (SALBAGAN) Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections, Pile and Pile cap for OHR etc. at Indranarayanpur W/S Scheme, Block - Patharpratima for implementation of JJM under Kakdwip Sub-Division of Alipore Divisi 86.17
11 Alipore Division ORD/000332/2024-2025 26/06/2024 2740/AD ALOK ENTERPRISE (A UNIT OF SAKET TREXIM PVT. LTD.) Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections etc at Dakshin Roypur PWSS, Block - Patharpratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (Part-A) (SM/11213) 97.48
12 Alipore Division ORD/002816/2023-2024 26/12/2023 1380/CSD KRISHNA CHANDRA ENTERPRISE Laying of pipeline near 1no. Pump House of Hiranmoypur water supply scheme, Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. 0.92
13 Alipore Division ORD/000383/2024-2025 25/07/2024 3079/AD RANJIT CONSTRUCTION Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at 3rd Tubewell Site for Augmentation of Bishnupur (Zone - I and II) W/S scheme, Block : Sagar under JJM of Kakdwip Sub-Division under Alipore 11.67
14 Alipore Division ORD/000388/2024-2025 25/07/2024 3084/AD M/S. DAS BUILDERS Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at 4th Tubewell Site for Augmentation of Naraharipur W/S scheme, Block : Sagar under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E 11.75
15 Alipore Division ORD/000365/2024-2025 10/07/2024 2914/AD GARGO TRADERS Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections, pile and pile cap for OHR etc at Bamanagar, Bhubannagar, Ramgopalpur, Uttar Kasiabad, Dakshin Kasiabad PWSS, Block - Kakdwip for implementation of JJM un 455.75
16 Alipore Division ORD/000394/2024-2025 18/07/2024 2999/AD ABONTICA ENTERPRISE Continuation for the work of Fund for 04 months (September to December) for sample collection charges where facilitators are unavailable / inactive related to Water Quality Monitoring & surveillance under JJM for Joynagar I & II block under RKMLSP, Nare 4.19
17 Alipore Division ORD/000233/2024-2025 24/07/2024 2608/AD RELIABLE CONSTRUCTIONS Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections etc at Gopalnagar Uttar PWSS, Block - Patharpratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (SM/13870) 64.65
18 Alipore Division ORD/000381/2024-2025 25/07/2024 3073/AD M/S KHAJABABA ENTERPRISE Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Augmentation of Manasadwip (Zone-I & II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Divisio 6.12
19 Alipore Division ORD/000389/2024-2025 25/07/2024 3057/AD M/S BABUSONA ENTERPRISE Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 3rd Tubewell Site of Dakshin Durgapur W/S scheme, Block : Namkhan under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (SM/18 9.58
20 Alipore Division ORD/000384/2024-2025 25/07/2024 3080/AD M/S AINUR ENTERPRISE Construction of 1 no. Pump House of size 5.40 mtr. x 3.60 mtr. at 4th Tubewell site for Bishnupur (Zone- I and II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (SM/13117) 7.18
21 Alipore Division ORD/000366/2024-2025 10/07/2024 2915/AD GARGO TRADERS Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections, pile and pile cap for OHR etc at Dakshin Chandranagar PWSS, Block - Namkhana for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P 98.12
22 Alipore Division ORD/000387/2024-2025 25/07/2024 3083/AD SWAPAN KUMAR PRADHAN Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at 3rd Tubewell Site for Augmentation of Naraharipur W/S scheme, Block : Sagar under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E 34.22
Total 1,397.15