No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
22 639.36
1 Alipore Division ORD/000510/2024-2025 06/09/2024 3610/AD M/S KHAJABABA ENTERPRISE Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 3rd Tubewell Site of Patibania W/S scheme, Block - Namkhana under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (SM/18395) ( 8.90
2 Alipore Division ORD/000396/2024-2025 30/07/2024 3162/AD M/S B.M. CONSTRUCTION Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections, Pile and Pile Cap for OHR etc at Raj Rajeshwarpur PWSS, Block -Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P 97.23
3 Alipore Division ORD/000643/2024-2025 16/08/2024 920/CSD SWAPAN KUMAR MANDAL Hiring of 1 (One) No. Diesel Car / Luxury Taxi for supervision of different works Under JJM at Canning Sub-Division of Alipore Division, PHE Dte. for 06 (six) months from the issuance of work order. 2.40
4 Alipore Division ORD/000550/2024-2025 18/09/2024 3779/AD NITYANANDA MONDAL Laying distribution system for additional works and other allied works for Augmentation of Kamalpur Rudranagar Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-II) (SM/10151) 60.65
5 Alipore Division ORD/000645/2024-2025 05/10/2024 4141/AD S. CHAKRABORTY AND CO. Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Ramchandrapur W/S Scheme, Block - Kakdwip for implementing of JJM under Kakdwip Sub-Division of Alipore Division, P. 20.41
6 Alipore Division ORD/000535/2024-2025 12/09/2024 3709/AD M/S KHAJABABA ENTERPRISE Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site for the Augmentation of Sabek Mahisahara & Adjoining Mouzas (Chunpuri) W/S Scheme, Block - Canning-II under C 6.97
7 Alipore Division ORD/000485/2024-2025 02/09/2024 3544/AD JYOTY SOLAR POWER Laying pipeline to connect the uncovered area at Purba Radhanagar (Zone-I) W/S Scheme, Block - Gosaba, under Canning Sub-Division of Alipore Division, P.H.E.Dte. 27.78
8 Alipore Division ORD/000511/2024-2025 24/06/2024 2720/AD BHUMI FOUNDATION Wall writing of IEC messages along with logo pictures etc. of multiple colour as will be supplied by the PHE Dte. on smooth wall surface at Falta and Diamond -I block under Alipore Division, PHE Dte. 3.24
9 Alipore Division ORD/000559/2024-2025 30/08/2024 429/RWS PARADIGM INFOSYSTEM Annual Maintenance Contract (AMC) for Computers,Printers,UPS and other related peripherals of 15(Fifteen) laboratories 1) South 24 Parganas District Laboratory,Bijoygarh 2)Southern Health Improvement Society 3) Kakdwip Sub-District Laboratory 4) Kensily A 2.80
10 Alipore Division ORD/000593/2024-2025 01/10/2024 4058/AD M/S KHAJABABA ENTERPRISE Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at Head Work Site of Sibnagar W/S Scheme, Block - Pathar Pratima under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (3rd Ca 32.15
11 Alipore Division ORD/000564/2024-2025 20/09/2024 506/RWS PARADIGM INFOSYSTEM Estimate of engagement of 01 (One) no Computer Operator/ Data Entry Operator of Category A on contactual basis through agency for Office of Assistant Engineer, under RWS,Alipore Sub-Division. PHE Dte. in the Dist. of South 24 Parganas under Alipore Divisi 2.64
12 Alipore Division ORD/000545/2024-2025 12/09/2024 3716/AD I.S. ENTERPRISE Laying of additional pipe line and other allied works at Bipradaspur W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. 76.62
13 Alipore Division ORD/000603/2024-2025 03/10/2024 4091/AD M/S KHAJABABA ENTERPRISE Construction of 500 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height including Geo- Technical investigation, foundation, pipeline connection and cost of pipes, specials etc. for Augmentation of Bayarsing piped 158.07
14 Alipore Division ORD/000471/2024-2025 23/08/2024 3457/AD SOMBHUNATH BHATTACHARJEE Construction of boundary wall along with Land Development and Plinth Protection and Approach Road at OHR Site for Augmentation of Kachuberia W/S Scheme, Block : Sagar under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (3rd Call) 29.95
15 Alipore Division ORD/000571/2024-2025 10/09/2024 483/DHSD AVIK ENTERPRISE Day to day maintenance of the office of the Assistant Engineer, Diamond Harbour Sub-Division of Alipore Division, PHE Dte. [For 1(one) Year]. 3.22
16 Alipore Division ORD/000572/2024-2025 10/09/2024 484/DHSD AVIK ENTERPRISE Laboratory-Cum-Store Maintenance of PHED Laboratory at Diamond Harbour Sub-Division Office compound under Diamond Harbour Sub-Division of Alipore Division, PHE Dte., Dist. South 24 Parganas (For 1(one) Year) 4.30
17 Alipore Division ORD/000514/2024-2025 24/06/2024 2721/AD BHUMI FOUNDATION Wall writing of IEC messages along with logo pictures etc. of multiple colour as will be supplied by the PHE Dte. on smooth wall surface at Kulpi and Diamond Harbour -II block under Alipore Division, PHE Dte. 3.40
18 Alipore Division ORD/000590/2024-2025 10/09/2024 485/DHSD S.S. ENTERPRISE (II) Laboratory-Cum-Store Maintenance of PHED Laboratory at Buita W/S Scheme under Diamond Harbour Sub-Division of Alipore Division, PHE Dte., Dist. South 24 Parganas (Period from 13/10/2024 to 31/08/2025) 2.85
19 Alipore Division ORD/000592/2024-2025 01/10/2024 4057/AD M/S KHAJABABA ENTERPRISE Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 2nd Tubewell Site of Ganeshnagar Zone-I W/S scheme, Block : Namkhana under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (S 8.68
20 Alipore Division ORD/000457/2024-2025 21/08/2024 3415/AD M/S KHAJABABA ENTERPRISE Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 4th Tubewell Site for Achintyanagar W/S scheme, Block : Pathar Pratima under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. ( 9.67
21 Alipore Division ORD/000442/2024-2025 25/07/2024 3077/AD MAA LAXMI ENTERPRISE Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections, pile and pile cap for OHR etc at Indraprastha PWSS, Block -Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H. 75.28
22 Alipore Division ORD/003028/2023-2024 29/12/2023 1400/CSD RAJKUMAR MANNA Hiring Motor launch for Canning Sub Division under Alipore Division, PHE Dte. in connection with execution & maintenance of different piped water supply schemes at different island in the district of South 24 parganas. (Period 01/01/2024 to 29/06/2024) 2.16
Total 639.36